Laserfiche WebLink
V <br />F - _M_ON A T1j I - YWD THUR, <br />SAT rrEM FEB 2 5 ZU16 <br />0 tXJ <br />D y D D <br />. . . . . . . . . . . . . damage <br />Vibration Usten for vibrations that could be a sign of impending failure (ex brw_ <br />Abnormal Noise - Listen for abnormsfnolse3 that could be a sign of impending failure (bearings grinding, pump <br />sounds like rocks are in It) <br />Lubrication - Check oiler or sight glass for proper oil level. Ensure od is clear, not extremely dirty or foamy <br />umplMotor Coupler isually inspect the coupler for signs of damage. L <br />V" s"itial u <br />P ook for 'Shaving wo ld Indicate <br />IR <br />impending failure Ensure safeguard Is In place to prevent entanglement in rotating shaft <br />V, <br />OfflOn Switches Ensure each switch is in the correct position, locked If required and dearly marked as to what <br />iloperales <br />Valve Position -Ensure valves are in the correct position, locked and/or sealed as required and clearly marked <br />with a tag with its PAID x or its purpose. <br />Containment Area - Ensure amals cfearolleaves and debris; inspect forsigns of damage <br />L <br />i! <br />L S In 'kiP 0 <br />Line ShocklPipe Vibration - Watch and Listen for vibration, which could be a sign of InconrcVy sized piping. <br />T, <br />pumps, pressure relief valves, etc. <br />pu m pressurerelief valves, <br />P Relief <br />PressureValves <br />a V E <br />a <br />Pressure Relief Valves -Ensure valves are marked clearly with P&D 9 and1br what it operates Look for ddps, <br />and sign amre <br />leaksd <br />leaks and sign of damage <br />'e 0 damage <br />ge <br />V/ <br />IIn <br />T Decals <br />I ac I Ensure pumps <br />E <br />Ta gs I Decals - Ensure all pumps am marked with their PSID X, a tag describing their function or some means of <br />g <br />i de n <br />identification <br />tio <br />..0 a <br />re re G u <br />Pressure Gauges -Recon! gauges when gauges are present Ensure the gauge is within operating <br />p n"n" <br />�0'_3 <br />tc <br />for your system <br />guidelines for your system. <br />0 <br />W. I . re ri re <br />Ethanol F.251 report differential pressure and operating pressure once a day <br />Ethanol 5 <br />0 <br />7 <br />pre rap�ri <br />Supreme <br />Supreme F-251 report differential pressure and operating pressure once per day <br />Rog Unleaded F-1 A report differential pressure and operating pressure <br />U I.. re <br />Rag Unleaded F•18 repo rt dIffe re nd &I pressure once par day <br />og <br />Dfesel F-20 report differential pressure and operating pressure <br />JD]esel F-21 report differential pressure and operating pressure <br />,A <br />lh'A <br />Ltf J_c <br />p. <br />Leaks - Look for leaks near seems, welds, fittings and valves. <br />"a <br />YF <br />Containment Area - Ensure area Is dear offeavesand debris, inspectforsigris of damage <br />L/ <br />" :V <br />Valve Position - Ensure "Nes are in The correciposJWn and locked or sealed when required Ensure all <br />connection points am plugged <br />A <br />Pressure Differential Gauges Record gauge "ILE LOADING IS TAKING PLACE ON ALL RISERS FOR <br />THAT PRODUCT} on appropriate form. Make sure gauge Is not damaged and is working correcity. <br />FS4 C/ <br />+.. <br />WPressure Relief Valve - Look lordripS, leaks and signs ofdamage. <br />L", <br />y, <br />r si <br />Seals and Locks -Ensum all seals and locks are in place and show no signs of tampering <br />Tags I Decals - Ensure all filter vessels are marked with their P&ID X, a tag describing their function or some <br />means of identification (Refer to API 1637 W MarkinglLabefing) <br />L/ <br />5 <br />f,%LI <br />Stiles./Platform - Ensure s6les and platform are sturdy; M signs of rust <br />Valve Position - Ensure valves are in the coned position (opefilldosed) and locked it required <br />ir-A <br />T, <br />�73) <br />rain Intake Ensure drainis ctearoldeblis that could inhibit flow or cause clogging <br />Sarah Terminal Last Updated 04/11/13 <br />