Laserfiche WebLink
_FEB 2 <br />THUR .- FRJITEM <br />SA7 iSUN <br />D D D D <br />0 <br />/ Breakersr$witches - Ensure switches am in the properposilion, are ncl !tipped and t�k b "Ipd cbvlou3 signs' <br />✓ i`" ' ° r� of tampering or damage <br />t ✓ '- ' ' Decals and Tags -Ensure elf breekers/switches are propedy and deartyidentd+ed <br />✓ Indicator Lights - Ensure all lights are working correctly and aro dearly identified <br />V Server Cabino! Ensure there are no red warning indicators on the front of the servers status panef or the aired <br />? Connect satellite box <br />V PLC Cabinet - Ensure there are no red oryellow indicators on the front of the PLC <br />V .eyi <br />fM.OWS Graphics - Ensure there are no red alarms in the Alarm Barlocated on the bottom of the UCOS Runtime <br />v ti/ <br />F 1 <br />Door Locks Ensure doors are Pocked and there are no signs of unauthor.'zed entry <br />.. <br />Enunciator LightslPanet - Ensure correct lights are onla f Press 'test' bufton, if equipped, to make sure all <br />lights work correctly. <br />✓ <br />Water Leaks - Look forsigns of waterleaking into MCC <br />_ <br />HVAC - Ensure the heating and cooling system Is working property <br />�/ "' ✓ r <br />z Labeling Ensure all equipment, switches and breakers are labeled properly for dearldentlficah'on <br />r:4.01_ <br />gin <br />Water Drains - Oprn to remove any water and then dose <br />✓ ," <br />Belts - Ensure the belts am not loo tight or too loose. Look for signs of wear <br />Gauges Ensure they work corectiy. Ensure compressor comes or✓oif e! caned setpoints <br />Levels -Check oiler or higfessibrin and condition of tit <br />°1nrc <br />✓'S ✓ <br />Abnormal Noise - Listen for squealing belts, grinding bearings and other noises that aren't normal and could be <br />h . ✓ ,r <br />a sign of impending failure <br />Vi bra don - Lookilisten for excessive vibrations that Indicate Impending failure <br />On-off Switch • Ensure switch operates correctly <br />Air Leak - Listen for leaks <br />IlIlir!2. <br />Valvas -Ensure sl! va+Yes arein their correct Operating positron <br />DAILY- Ysually inspect to ensure there ere no vapor or liquid leaks <br />rSTAGECheck forproduct and vaporleaks. Inspect liquid level to prevent overflowing. Make <br />works correciiy and there are no signs of contamination. <br />G C J <br />STAGE 2 Check forpmduct and vaporleaks. Inspect liquid level to prevent overflowing Make <br />t <br />sum pump works cormaly and them are no signs of contamination. <br />sem- <br />STAGE J Check for product and vapor leaks. Inspect liquid level to prevent overflowing- Make <br />wt s <br />surepump works correctty and there am no signs of contamination. <br />Drums - How many drums are on sife7 Check for spills, leaks and signs or damage. Ensure drums are stored <br />that their <br />within guidelines and are dated, arrange to have drums removed are approaching storage deadline <br />Drum Labeling - Ensure all drums am labeled property within guidelines, with accumulation start date and that <br />v k <br />date is less then 90 days old ensure drum Md is secured <br />w Housekeeping - Leaks orspilrs keep clean and orderly, ensure cnly appropriately labeled waste is stored there <br />Bann Terminal Last Updated 04/11/13 <br />