My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Weekly Review-. Date: <br />Te I Manager Signature <br />1112-9,1 J-3 <br />Banta Terminal Last Updated 04/22/13 <br />Carbon Bed Temperatures/ Vessel# I Top <br />Tem,raturesJ Vemel 91 Botlon <br />ENRON* <br />_CarbonSed <br />Carbon Bed Temperatures/ Vessel $2 Top <br />Carbon Bed TemperaturesJ Vessel 92 Bottom <br />Gasolina Temperature (Ab3ortyent) <br />TI -701 absorbentsupp <br />NIS .11" <br />W? <br />ZEW-R-W <br />TI -303 (absorbent from exch.) <br />Vacuum eump seal fluid. termperatures and flow <br />C-1 GPM <br />C-2 GPM <br />TI -401 Inlet <br />ANEIZIN- <br />T1402 Discharge #1 <br />&.5TI-403 <br />Discha-,ge #2 <br />Seat fluid level tplaoe check mark If near center of site glass) <br />Gasoline level (place rheck mark if near center of site glass] <br />Gasoline circulation pressures <br />k— <br />PI -301 Top absorber nozz)e <br />PAZ <br />AW <br />PI -302 Lower absorber NoZzle <br />R0iulf <br />VW <br />AF <br />;F-77 <br />FIT1. <br />rLD MR <br />5,00,14 <br />INEW <br />=-;W, EV--; <br />0954, <br />AnX evidence of carbon dust from ajliio�ven P <br />Any visible vapar at absorber ven!?---- <br />Any visible vapor at PN valve? <br />"M <br />Any ftuid leaks7 <br />Any unusual noise or vibration37 <br />.Wednesdo <br />Thursda.y <br />Weekly Review-. Date: <br />Te I Manager Signature <br />1112-9,1 J-3 <br />Banta Terminal Last Updated 04/22/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.