Laserfiche WebLink
Banta Terminal LastUpdatad 04/11/13 <br />l Ethanot F-251 report differential pressure and operating pressure once a day <br />FRI : , SAT- - --— �� CD 4 2 <br />REM <br />ldofl 7UE .: riED <br />Supreme F-261report differential pressure and operating pressure once per day <br />D D p 11 <br />4; ti <br />' - Leaks Check al pumps fcr drips, Pmaks er damage �� <br />Vlbration - Listen for vibrations that could be a sign ofimpending failure(glydn@ItT-4,17WRAWW-9 nt) <br />Rog Unleaded F•1B report differential pressure once per day <br />Abnormal Noise listen for abnormal noises that could be a sign of impending failure (bearings grinding, pump <br />sounds like rocks are in 11) <br />^, / <br />A ?• / <br />! <br />' ' Lubrication - Check ober or sight glass for proper oil level Ensure ail is dear, not extremely dirty or foamy <br />Diesel F-21 reportdifferenWl pressure and operating pressure <br />_4 PumpiMotor Coupler - Visually inspect the coupler for slgns of damage Look for 'shavings`thaf wouldIndicate <br />q„ <br />5 <br />r <br />impending failure Ensure safeguard is M place to prevent entanglement in rotating shalt <br />1` <br />• <br />Leaks - Look forleaks near seams, welds, fittings and valves. <br />Offlon Switches - Ensure each switch is in the correct position, locked if required and deerty marked as to what <br />it operates <br />Containment Area - Ensure area is dear of leaves and debris, inspect for signs of damage <br />Valve Posldon -Ensure valves are in the coned position, locked andfbr sealed as required and clearly marked <br />with a tag with Its P&ID K or its purpose <br />Containment Area - Ensure area is dear offeaves and debris, Inspect forslgns ofdamage <br />Valve Position -Ensure valves are in the correct position and locked or sealed when required Ensureall <br />✓ <br />yz' <br />iw Lin a ShockfPipe Vibration - Watch and listen for vibration, which could be a sign ofincorrectly sized piping, <br />connection points ere plugged <br />r`' pumps, pressure relief valves, etc. <br /><j PressureRellef Valves -Ensure valves are marked Beady with PAID 1 and/or what It operates Look ftordAps, <br />'• ;' <br />leaks and sign of damage <br />{ - . Taps / Decala -Ensure at/ pumps are marked wilh thelrPdlD >K, a tag describing their lunafion or some means Of <br />' <br />j. <br />identification <br />71 Pressure Gauges Revord pressure gauges when gauges are present. Ensure the gauge is within operating <br />THAT PRODUCT) on appropriate fort. Make sure gauge is not damaged and is working corrucy <br />✓ <br />y <br />guidelines for your system. <br />I <br />Banta Terminal LastUpdatad 04/11/13 <br />l Ethanot F-251 report differential pressure and operating pressure once a day <br />Supreme F-261report differential pressure and operating pressure once per day <br />Reg Unleaded FAA report differential pressure and operating pressure <br />Rog Unleaded F•1B report differential pressure once per day <br />Diesel F-20 report differential pressure and operating pressure <br />Diesel F-21 reportdifferenWl pressure and operating pressure <br />Leaks - Look forleaks near seams, welds, fittings and valves. <br />Containment Area - Ensure area is dear of leaves and debris, inspect for signs of damage <br />Valve Position -Ensure valves are in the correct position and locked or sealed when required Ensureall <br />✓ <br />yz' <br />connection points ere plugged <br />Pressure Differential Gauges - Record gauge (AHLE LOADING iS TAKING PLACE ON ALL RISERS FOR <br />THAT PRODUCT) on appropriate fort. Make sure gauge is not damaged and is working corrucy <br />✓ <br />y <br />a <br />I <br />Pressure Relief Valve • Look for drips, leaks and signs of damage <br />i`. <br />` <br />3�%1 Seals and Locks Ensure all seats and locks are in place and show no signs of tampering <br />1747 <br />�- Tags f Decals - Ensure all fiber vessels are marked with thelrPAID e a tag describing fhelrfunction orsome <br />means of identification. (Refer to API 1637 for Markingtabeling) <br />StllealPlatform • Ensure 35fes and platform are sturdy, no signs of fvst <br />s/ <br />..-� � <br />� <br />J <br />•r <_ <br />r'_ Valve Position -Ensure valves are in the coned position (open/dosed) and lockod ifrequired <br />Drain Intake - Ensure drain Is dear of debris that could inhibit Now of cause Uoggrng <br />l : <br />Banta Terminal LastUpdatad 04/11/13 <br />