My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 2 5 2016 <br />Banta Terminal /�J Last Updated 04/11/13 <br />Turbine Meter - Visually inspect the turbine meter for leaking atAa s pro r ration ( meter <br />count) ( x <br />Control Valve - Visually inspect the control valve for damage, leakirn44f716bpa! iStt$fer. PWlti*1T <br />controlled opening and closing <br />/ <br />V <br />✓ <br />Drain boxes/pump off systemsibuckets - Ensure boxes and buckets are empty Make sure pump off <br />system hose and fittings are in good condition and gaskets are present and in good condition. Ensure <br />there are no air leaks. <br />r <br />/ <br />Drains - Ensure all drains are Gear of debris that could inhibit flow or cause clogging. <br />y/ <br />✓ <br />/ <br />t/ <br />Locks and Seals — Ensure all locks and seals are 1n place on the meters, pre -amp housings and <br />valves. <br />Heat Sensors - Ensure the sensors are present and show no obvious signs ofdamage. <br />/ <br />..� <br />Emergency Shutdown {ESD) - Ensure the ESD is clearly Identified and labeled and there are no <br />obstructions that would prevent access. <br />Signage - Ensure loading procedures and current version of the Product Loading Sequence Chart <br />(PLSC) are present and in good condition. <br />Lights - Ensure they are present and show no obvious signs of damage Ensure they tum on and off at <br />the correct times to provide sufficient lighting. <br />Canopy Rain Gutters - Ensure they are securely fastened and show no obvious signs of damage. <br />Make sure the downspouts are not directing water into areas that could cause injury or equipment <br />damage. <br />- <br />Video Cameras -Ensure they are present and show no obvious signs of damage Check monitor <br />inside to ensure they are working property, are in focus and are adjusted to provide maximum viewing. <br />�- <br />Intercoms -Ensure they are present and show no obvious signs of damage. <br />wo � <br />Eye Wash Stations - Ensure eye wash stations are clearly identified and labeled and there are no <br />obstructions that would prevent access <br />Emergency Shower - Ensure shower is clearty identified and labeled and there are no obstructions <br />that would prevent access. <br />/ - <br />Deeco Screens - Ensure the screen is on and legible and shows no signs of damage. Ensure <br />enclosure is locked. <br />/ <br />BOL Room - Ensure cleanliness, verify printer paper available for BOL and joumey plan printers, <br />ensure RACS cabinet is locked <br />Housekeeping - Pick up all trash and debris. Empty trash cans. <br />TUE <br />WED <br />THUR I <br />Frd <br />SAT SUN ITEM --- ----- <br />I D 0 <br />_MON <br />❑ <br />❑ <br />D <br />D <br />0 <br />TTLR Back Pressunt Gauge Inspection (inches of water) <br />Lane 1- While trucks are loading, record the gauge reading. Make sure it is within the operating limits of <br />r it. <br />r <br />Lane 2- While trucks are loading, record the gauge reading. Make sure it is within the operating limits of <br />your permit. <br />r . - <br />Lane 3- While trucks are loading, record the gauge reading. Make sure it is within the operating limits of <br />rmit. <br />Lane S transmlx- While trucks are loading, record the gauge reading Make sura it is within the <br />operating limits of i -cur permit. <br />Tanker Overfill PnAoction (ex: Scully, Chracon) <br />Lights - Ensure all lights are working <br />Cords - Ensurethere are no obvious s' rs of dame a nicks, cuts, exposed wires} <br />�� ✓ <br />Ensure bypass boxes are locked/sealed <br />Receptacle Enda - Ensure the end is in good condition and shows no signs of damage Look for pins in <br />the socket that are loose or stuck. <br />Additive System at <br />ttse d -Packs., Pro acs, Pro-Pac 3 <br />Housing -Ensure housing is in good condition and shows no sign of damage Ensureunit is on screen <br />is legible and there an, no alarms. <br />Leaks - Check all valves, fittings and connections for drips and leaks Ensure all valves are in the <br />proper position. <br />nters - Ensure ters are on, have show no ns of da and are workin <br />Forms - Ensure there is a sufficient supply of MS -1078 forms, that they are the most current revision <br />and there is an example posted to help drivers to fill them out correctly <br />HVAC System -Ensure AGNeat is set at the proper temperature and is working correctly <br />Banta Terminal /�J Last Updated 04/11/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.