Laserfiche WebLink
BANTA TERMINAL DAIL Y/ WEEKL YASSIGNM641;1,°; 6 <br />A SIG ED TO PLANT OPERATORS FEB 2 5 20 �G <br />WEEK OF �R `13 NAME G EI�V�����vTAi <br />WHAT TO DO <br />WHEN <br />M <br />T <br />W <br />T <br />F <br />DAILY RACK BALANCE ( SAP and WebStock) <br />D <br />✓ <br />SMIS UPDATE (by Sam <br />D <br />MS -445 FOR PIPELINE TENDER (review & <br />D <br />/ <br />✓ <br />t/ <br />reconcile with pipeline scheduler as needed)i/ <br />REVIEW STAND ALONE & MS -1018s <br />D <br />/ <br />✓ <br />,/ <br />t�- <br />DOCUMENTS CA compliance) <br />V <br />AMS UPDATE RPT. 10 <br />D <br />TANK FARM, TERMINAL YARD & WASH <br />D <br />✓ <br />v <br />RACK neatness and cleanliness <br />RACS CABINET(Green Lights on all <br />D <br />✓, <br />✓ <br />machines FBS FDS, FCU, <br />CHECK SURVEILLANCE CAMERA <br />D <br />SYSTEM Switch tapes daily) <br />V.R.U. & TERMINAL DAILY CHECKLIST <br />D <br />ASSESS MAINTENANCE NEEDS (Enter all <br />D <br />V/, <br />✓ <br />f <br />breakdowns in SAPPM as needed <br />HAZARDOUS WASTE LOG <br />D <br />✓ <br />t/ <br />AS NEEDED <br />NON-HAZ WASTE LOG <br />D <br />AS NEEDED <br />IMPOUND DRAIN LOG AS NEEDED <br />D <br />✓ <br />/ <br />Storm water log FORM #4 <br />GAS TEST RACK (Vapor hoses & couplings, <br />W <br />Drybreaks and product hoses. Record <br />readings) <br />UPDATE OPERATORS PAYROLL <br />W <br />CHECK & LOG RED DYE SEAL#'s & <br />W <br />INVENTORY. <br />RECORD RED DYE TOTE LEVEL <br />W <br />STEAM CLEAN T.T.L.R. <br />W <br />WEEKLY RACK BALANCE T. M. TO SIGN <br />W <br />OFF review SAP <br />RED DYE SEAL INSPECTION & INVENTORY <br />W <br />LOG <br />ARIBA, COMPLETE AND SUBMITT ORDERS <br />W <br />as needed <br />TANK SAMPLING Record tank tested. (Grabner, <br />W <br />Petro -Spec, Diesel }lash, Red Dye, Ethanol test <br />HAZ WASTE INSPECTION FORM <br />W <br />FIRE PUMP SYSTEM TEST <br />W <br />Run 30mins. Weekl & complete test form <br />REMARKS <br />