My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevro;i <br />Control — Sized Secondary Containment *0 <br />',-4ulk Storage Containers - 40 CFR 112.8(c)(2) <br />� Must contain the shell capacity of the single largest tank in each individual dike, plus <br />sufficient freeboard for rainfall. <br />Shell capacity is based on tank outer dimensions or tank strapping chart overfill volume. <br />Freeboard must accommodate the 25 -year, 24-hour storm event. <br />Mobile/Portable Storage Containers - 40 CFR 112.8(c)(11) <br />• Must contain the shell capacity of the single largest tank in each individual dike, plus <br />sufficient freeboard for rainfall. <br />— Shell capacity is based on tank outer dimensions or tank strapping chart overfill volume. <br />— Freeboard must accommodate the 25 -year, 24-hour storm event. <br />Loading Racks - 40 CFR 112.7(h)(1) <br />• Must contain the maximum capacity of the single largest compartment of any tanker <br />truck loaded or unloaded at the TTLR (Includes rail spurs). <br />— Sized containment may be met by permanent berms/curbing or a quick drainage system to <br />an additional containment area (catchment basin, oil/water separator, containment sump). <br />(D 2014 Chevron 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.