My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Updating <br />updating SPCC Plan <br />■ The SPCC Plan must be updated (full or partial) when the facility has been <br />changed in design, construction, operation, or maintenance, which affects the <br />facility's discharge potential, including: <br />IJA <br />CL Decommissioning a tank (permanently out -of -service) <br />Cn <br />LU Building or adding a new tank/container >55 gallons <br />z <br />D — Changing product stored or operating conditions <br />— Changing secondary containment measures (adding/removing dikes, <br />berms, liners., drains" catchment basins) <br />■ Amendments to the SPCC Plan must be prepared within 6 months of an <br />applicable change or review, and implemented as soon as possible, but no <br />later than 6 months following the Plan update. <br />0 At a minimum, the SPCC Plan must be fully reviewed every five years. <br />■ Any technical changes must be stamped by a Professional Engineer (P.E.), <br />for either a full or partial review of the Plan. <br />0 2014 Chevron <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.