Laserfiche WebLink
Weekly Review <br />Date: W 2-3 1 l3 <br />RECEIVED <br />MAY 2 6 2017 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />Banta Terminal Last Updated: 04/11/13 <br />ciVAPOR RECOVERY UNIT (4RU) 7 VAPOR COMBUSTION UNIT VCU <br />MON TUE <br />D -Nr_. D - W <br />WED THUR FRI <br />D N- D :N :, D :N <br />SAT SUN " <br />00 tin c ; <br />D N D i N RANGE <br />tank <br />tem <br />Vi <br />LESS THAN 18 <br />INLET VAPOR PRESSURE <br />Carbon Bed Temperatures/ Vessel #1 Top <br />Carbon Bed Tem natures/ Vessel #1 Bofton <br />Carbon Bed Temperatures/ Vessel #2 To <br />Al"? Omwl <br />oo'" <br />-7 <br />-, <br />90 MAX <br />10OF MAX <br />report <br />report <br />Carbon Bed Temperatures/ Vessel #2 Bottom <br />Gasoline Temperature Absorbent <br />TI -701 absorbent supply) <br />TI -303 absorbent from exch. <br />Vacuum pump seal fluid, term eratures and flow <br />C-1 GPM <br />C-2 GPM <br />I <br />9J '.. <br />105F MAX <br />135F MAX <br />TI -401 Inlet <br />TI -402 Discharge #1 <br />135F MAX <br />TI -403 Discharge #2 <br />ate;- I/ _ x ;, <br />✓ ' ✓ <br />report or check <br />Seal fluid level lace check mark if near center of site lass <br />+^ �/ <br />V <br />report or check <br />18 PSIG MAX <br />Gasoline level lace check mark if near center of site lass <br />Gasoline circulation pressures <br />PI -301 Top absorber nozzle <br />y <br />' < <br />� � <br />- 17 PSIG MAX <br />PI -302 Lower absorber Nozzle <br />20E0 PSIG <br />PI -701 P-1 Discharge <br />1 <br />7 <br />20.60 PSIG <br />PI -601 P-2 Discharge <br />28" HG <br />PI -501 Vacuum control tri point <br />11Z i <br />Z <br />y <br />Record CEM instant reading <br />Record CEM rolling PPM reading <br />CEM data unit working properly? <br />FQ <br />il l) <br />An evidence of carbon dust from absorber vent? <br />r.0 <br />� ) <br />An visible va or at absorber vent? <br />An visible va r at PN valve? <br />W <br />i <br />Any fluid leaks? <br />Z lil <br />_ <br />Any unusual noise or vibrations? <br />/ <br />r> <br />Gas (Nitrogen) <br />it <br />San Gas (Propane) <br />Day <br />Day Shift Operator Signature Night ShiftOperator Signature <br />Monday <br />Tuesday <br />Wednesday <br />Thursday <br />Friday <br />Saturday <br />Sunday <br />Turnover Comments (noteahy.lncortlpitl 2astcs_pr.corrective:actlons tor.ir_e�cL..ciew to -fin <br />'= <br />-- <br />_ <br />Tirrniiyer bccepted $y <br />Weekly Review <br />Date: W 2-3 1 l3 <br />RECEIVED <br />MAY 2 6 2017 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />Banta Terminal Last Updated: 04/11/13 <br />