Laserfiche WebLink
MON <br />I ;TUtEWED <br />-.INUR <br />.. <br />- <br />�. <br />'.: ,,: ,�» „�r5' ,. rt., ''• i.:at .::: �',.... .. ;r:: ,. <br />Product Loading Hoses -Visually inspect for wear, damage, corrosion, kinks, drips and leaks. Ensure hoses <br />are clearly marked with riser number and product service <br />D <br />:..:N - <br />D <br />�kN <br />D <br />;N, <br />D <br />,uN <br />D <br />�, <br />D <br />'N <br />tl <br />I <br />V <br />Dry Break Couplers - Visually inspect for damage, corrosion, proper orientation (observe hookup to vehicle dry <br />break), abnormal drips, leaks. Ensure gaskets are in place and in good condition. Ensure handles and pins are in <br />good condition. <br />J• <br />r <br />✓ <br />t/ <br />•%�, <br />u;, <br />/ <br />✓ <br />' <br />:. <br />r <br />'� -: <br />''' <br />Product Hose Swivels -Look for drips and leaks. Make sure swivels move freely and easily. <br />Counterweights - Visua/ly inspect the counterweight for damage or corrosion; Move the loading arm and check <br />ease of movement and balance <br />d <br />✓ <br />i" <br />:: <br />r -- <br />Vapor Hoses -Visually inspect for damage and vapor leaks. Ensure there is no produc} in the hose. Make sure <br />gaskets are in place and are in good condition. <br />Jm <br />/ <br />V <br />Vapor Couplers - Ensure gaskets are in place and in good condition Make sure plunger is present to push in <br />poppet on tanker. Make sure ears and pins are in good condition <br />Y <br />/ <br />V <br />c <br />✓ <br />== <br />Vapor Hose Swivel Joints - Visually inspect for damage, drips and leaks. Ensure swivels move freely and <br />easily; proper operation: full, smooth movement of the loading arm <br />✓and <br />s: <br />Prod uctVapor Valves & Piping/Supports - Visually inspect for drips and leaks, particulany at connect on points <br />flanges. Look for signs of damage and/or corrosion. Ensure piping is clearly labeled with product service <br />and flow direction <br />Y <br />t: <br />Turbine Meter -Visually inspect the turbine meter for leaking at flanges, proper operation (e.g. meter count) <br />Control Valve - Visually inspect the control valve for damage; leaking at flanges; proper operation: controlled <br />opening and closing <br />✓ <br />J <br />P; <br />` <br />a«� <br />Drain boxes/pump off systems/buckets - Ensure boxes and buckets a2 empty. Make sure pump off system <br />hose and fittings are in good condition and gaskets are present and in good condition. Ensure there are no air <br />leaks. <br />J✓ <br />; <br />J <br />Drains - Ensure all drains are clear of debris that could inhibit flow or cause clogging. <br />f <br />- <br />, <br />/ <br />✓ <br />Locks and Seals — Ensure all locks and seals are in place on the meters, pre -amp housings and valves. <br />J <br />J <br />v <br />J <br />J <br />Heat Sensors - Ensure the sensors are present and show no obvious signs of damage. <br />Emergency Shutdown (ESD) - Ensure the ESD is clearly identified and labeled and there are no obstructions <br />that would prevent access. <br />7F <br />Y <br />/ <br />4 <br />x- <br />V/ <br />Signage - Ensure loading procedures and current version of the Product Loading Sequence Chart (PLSC) are <br />present and in good condition. <br />Lights - Ensure they are present and show no obvious signs of damage. Ensure they tum on and off of the <br />correct times to provide sufficient lighting. <br />✓ <br />J <br />Canopy Rain Gutters -Ensure they are securely fastened and show no obvious signs of damage. Make sure <br />the downspouts are not directing water into areas that could cause injury or equipment damage. <br />J <br />V <br />J <br />/ <br />V <br />/ <br />V <br />Video Cameras - Ensure they are present and show no obvious signs of damage. Check monitorinside to <br />ensure they are working property, are in focus and are adjusted to provi de maximum viewing. <br />J <br />Jf <br />V <br />Intercoms -Ensure they are present and show no obvious signs o1 damage. <br />Eye Wash Stations - Ensure eye wash stations are clearly identified and labeled and there are no obstructions <br />that would prevent access. <br />Emergency Shower -Ensure shower is clearly identified and labeled and there are no obstroctions that would <br />prevent access. <br />J <br />Y <br />J <br />Deeco Screens - Ensure the screen is on and legible and shows no signs of damage. Ensure enclosure is <br />locked. <br />v <br />v <br />BOL Room - Ensure cleanliness, verify printer paper available for BOL and journey plan printers, ensure RACS <br />cabinet is locked <br />.: <br />I Housekeeping - Pick up all trash and debris. Empty trash cans. <br />L <br />MM <br />Et4VIRONMCITAL HEALTH <br />DEP) :RTNt-NT <br />Banta Terminal Last Updated: 04/11/13 <br />