Laserfiche WebLink
MON <br />D <br />TUE <br />D <br />WED <br />D <br />THUR FRI SAT SUN <br />Item <br />D D D D <br />/ H <br />tOil� <br />VRU - Visually inspect for leaks, excessive or unusual noises; take daily readings; check level in vapor <br />knockout tank <br />• <br />INLET VAPOR PRESSURE <br />51 <br />Carbon Bed Temperatures/ Vessel #1 Top <br />Carbon Bed Tem ratures/ Vessel #1 Botton <br />Carbon Bed Temperatures/ Vessel #2 To <br />Carbon Bed Temperatures/ Vessel #2 Bottom <br />Gasoline Temperature (Absorbent) <br />TI -701 absorbent supply) <br />TI -303 absorbent from exch. <br />Vacuum um seal fluid, term eratures and flow <br />C-1 GPM <br />C-2 GPM <br />c <br />TI -401 Inlet <br />TI -402 Discharge #1 <br />n <br />TI -403 Discharge #2 <br />Seal Fluid level place check mark if near center of site lass <br />! <br />Gasoline level lace check mark if near center of site lass <br />Gasoline circulation pressures <br />PI -301 Top absorber nozzle <br />PI -302 Lower absorber Nozzle <br />PI -701 P-1 Discharge <br />PI -601 P-2 Discharge <br />PI -501 Vacuum control trip point <br />Record CEM instant reading <br />Record CEM rolling PPM reading <br />✓ <br />CEM data unit working ro erl ? <br />KID I <br />Any evidence of carbon dust from absorber vent? <br />Any visible vapor at absorber vent? <br />N30 <br />AjQ <br />Any visible vapor at P/V valve? <br />Any fluid leaks? <br />Any unusual noise or vibrations? <br />Gas (Nitrogen) <br />San Gas (Propane) <br />Day <br />Day Shift Operator Signatui Night Shift Operator Signature <br />Monday <br />Tuesday <br />Wednesday <br />Thursday <br />Friday <br />Saturday <br />Sunday <br />Turnover Comments (note any incomplete tasks or corrective actions for next crew to finish): <br />Turnover Accepted By: <br />Weekly Review: \ W J1 l 1 l Cl <br />i <br />Terminal <br />MAY lw� 6 2017 <br />EiJ`JIR ONN: TAL HEALTH <br />DE7i:J iTIV:7"NT <br />Banta Terminal Last Updated: 04/11/13 <br />