My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MON TUE <br />D D <br />APOR RECOVERY UNIT (VRU) I VAPOR COMBUSTION UNIT (VCU) _._._. <br />6 <br />WED THUR FRI SAT SUN <br />Item <br />D D D <br />Y <br />v t/ <br />r <br />VRU -Visually inspect for leaks, excessive or unusual noises; take daily readings; check level in vapor <br />knockout tank <br />INLET VAPOR PRESSURE <br />�I Carbon Bed Temperatures/ Vessel #1 Top <br />Carbon Bed Tem ratures/ Vessel #1 Botton <br />Carbon Bed Temperatures/ Vessel #2 To <br />Carbon Bed Temperatures/ Vessel #2 Bottom <br />Gasoline Temperature (Absorbent) <br />TI -701 absorbent supply) <br />TI -303 absorbent from exch. <br />vacuum pump seal fluid, termperatures and flow <br />C-1 GPM <br />C-2 GPM <br />TI -401 Inlet <br />too TI -402 Discharge #1 <br />TI -403 Discharge #2 <br />3 Seal fluid level lace check mark if near center of site lass <br />Gasoline level lace check mark if near center of site lass <br />Z <br />fim Gasoline circulation pressures <br />PI -301 Top absorber nozzle <br />r Q <br />D PI -302 Lower absorber Nozzle <br />� <br />PI -701 P-1 Discharge <br />_ <br />145 PI -601 P--2 Discharge <br />Z— <br />PI -501 Vacuum control trip point <br />— <br />Record CEM instant reading <br />Record CEM rolling PPM reading <br />• <br />f . CEM data unit workino Properly? <br />rNmv <br />Any evidence of carbon dust from absorber vent? <br />tj n <br />P40 Ky Any visible vapor at absorber vent? <br />Any visible vapor at P!V valve? <br />Any fluid leaks? <br />Any unusual noise or vibrations? <br />t Gas (Nitrogen) <br />Span Gas (Propane) <br />Day <br />Pay-oift Operatoignatui Ni ht Shift Operator Signature <br />Monday <br />Tuesday <br />Wednesday <br />Thursday <br />Friday <br />Saturday <br />Sunday <br />Turnover Comments (note any incomplete tasks or corrective actions for next crew to finish): <br />Turnover Accepted By: <br />Weekly Review: <br />T <br />i <br />c::"j 1131/y <br />�4iNl� N V r1J�7 <br />E� N1 RONP!"— . A.L H'AL.TIA <br />Banta Terminal Last Updated: 04/11/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.