Laserfiche WebLink
7 <br />1� r c; _ _ mss✓ <br />MAY 2, 6 2017 <br />Chevron <br />Recent SPCC Precautionary Measures <br />® Summary of major changes to SPCC Plan due to a recent spill or full 5 -year <br />review. <br />® New secondary containment measures (liners, temporary containment, dike <br />modifications) <br />In New applicable operating procedures, checklists or standards? <br />— SOPs <br />— Regional Engineering Standards <br />21 Additional opportunities encountered during facility operations? <br />Modify this slide for your terminal(s) to describe <br />all lessons learned within the last 3 years. <br />* Encourage open discussion. <br />© 2014 Chevron <br />