My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T&O Regio,nal Engineering <br />r% r". i ^ ^ �--ft <br />LAST External Inspection Checklisi- <br />l�. Lj <br />LAST <br />External Inspection Checklistti <br />the tank is present. <br />5 Check operation of regulators for tanks with <br />ur a aass stems. <br />r, <br />L <br />6 Check temperature Indicators for damage. <br />7 Check welds on shell -mounted davit clips, <br />3.3 <br />AUTOGAUGE SYSTEM <br />E <br />OK <br />NA Comments: <br />1 <br />inspect autogauge tape guide and lower sheave <br />housin(floating swin s for leaks. <br />�I <br />2 <br />Inspect autogauge head for damage and check <br />-legibility. <br />3 <br />Bump the checker on autogauge head to check <br />for proper movement of tape. <br />4 <br />Identify size and construction material of <br />auto au a tae guide(floating roof tanks). <br />5 <br />Ask operator If tape tends to hang up or suffer <br />other problems during floating roof movement <br />(floatincl roof tanks). <br />6 <br />For board -type autogauges, Inspect condition of <br />board and Icglulli . <br />7 1 <br />Test freedom of movement of marker and float. <br />B 1 <br />Record the product level. <br />3.4 <br />SHELL <br />-MOUNTED SAMPLE STATION <br />E <br />OK <br />NA Comments: <br />1 <br />Inspect sample lines for function of valves and <br />plugging of lines, Including drain or <br />retum-to-tank line. <br />2 <br />Check circulation pump for leaks and operating <br />problems. <br />3 <br />Inspect bracing and supports for sample lines <br />and equipment. <br />3.5 <br />HEATER SHELL MAN HoLEr MOUNTED <br />E <br />OK <br />NAComments: <br />I <br />Inspect condensate drain for presence of <br />1 <br />product indicating leakage. <br />3.6 <br />MUM. <br />E <br />OK <br />NA Comments: <br />1 Inspect for proper mounting flange and support. <br />2 Inspect for leakage. <br />- <br />3 Inspect condition of power lines and connections <br />F <br />;7 <br />to mixer. <br />3.7 <br />SWING LINES <br />E <br />OK <br />NA Comments: <br />1 <br />Indicator: Check that the Indicator moves In the <br />proper direction: Floating swing line indicators <br />show a lower level as cable is wound up on the <br />winch. Non -floating swing line Indicators show <br />the opposite. <br />2 <br />Cable: check for wear or fraying. <br />3 <br />Does the floating suction board indicator have <br />top and bottom position markings on the shell <br />with written labels? <br />4.0 <br />FIXED ROOF <br />4.1 <br />GENERAL <br />E <br />OK <br />NA <br />Comments: <br />1 <br />Is the roof free of debris? <br />o r- a a <br />2 <br />Record the roof type, roof slope, and roof -to - <br />shell connection dimensions. <br />3 <br />For aluminum dome roofs, record the <br />manufacturer and serial number. <br />4 <br />Record roof thickness measurements (steel <br />roofs). Take at least 10 thickness <br />measurements at a maximum spacing of 10 ft <br />along two perpendicular lines. If any thickness <br />Is less than 0.09 in., measure 3 additional <br />thicknesses In a 100 int area around that <br />location. <br />4.2 <br />ROOF <br />CORROSION <br />I E <br />I OK <br />NA <br />I Comments: <br />Revision Date: Oct2013 Page 4 of 9 <br />-IZALTH <br />T <br />
The URL can be used to link to this page
Your browser does not support the video tag.