My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
4740
>
2800 - Aboveground Petroleum Storage Program
>
PR0515786
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 4:51:57 PM
Creation date
10/10/2018 4:16:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515786
PE
2832
FACILITY_ID
FA0010337
FACILITY_NAME
PAUL E VAZ TRUCKING INC
STREET_NUMBER
4740
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01704021
CURRENT_STATUS
01
SITE_LOCATION
4740 E PELTIER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br />Enviromental Heath Department <br />1868 E. Hazelton Av. <br />Stockton, Ca, 95205 <br />Attn: Aaron Hang <br />Subject: Amendments to the Vaz Trucking 2000 SPCC Plan <br />Ladies and Gentlemen, <br />=' F�tiCN <br />THILL <br />ENGINEERING <br />12793 PADDY CREEK LANE LODI, CA 95240 <br />PH. (209) 368-9381 FAX (209) 367-1163 <br />April 23, 2018 <br />RECER/9:D <br />APR 2 5 2W <br />ENVIRONMENTAL HEALTH <br />PERMITiSERor,Fs <br />Paul E. Vaz Trucking, Inc. has retained this office to review and update the orginal SPCC plan of <br />5/08/2000 written by this office. Please note, a copy of this plan is enclosed with this letter. This plan <br />has not been amended since 11/2000. Major improvements and modifications have been made to the <br />property since November of 2000. Petroleum storage and dispensing equipment has been added or <br />modified and the site storm drainage system has been changed. As a result of these modifications, <br />the orginal amended SPCC plan needs a full review and major modifications. A new onsite storm <br />drainage sand and oil seperator needs to be designed and constructed. <br />To make these modifications this office requests a time extention of six months to complete the work <br />and issue an amended SPCC plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.