My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PETERSEN
>
3663
>
2800 - Aboveground Petroleum Storage Program
>
PR0517463
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 11:41:08 AM
Creation date
10/10/2018 4:21:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517463
PE
2832
FACILITY_ID
FA0010627
FACILITY_NAME
Penske Truck Leasing Co., LP
STREET_NUMBER
3663
STREET_NAME
PETERSEN
STREET_TYPE
Rd
City
Stockton
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
3663 Petersen Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans &applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NOY, <br /> 2. Submit copies of IQC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> goo, i # ECPuz V327aoy <br /> Cii'UAimed <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> E C T i4 ROurJ it EL P wZ V 327 -.Dq jS D <br /> (GL�;k., <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.