Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained EHD) <br /> 1. Site map enclosed? YES [ ] NOx <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all ma acturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensu r a copy of the "Site Health and Safety <br /> Plan" is available on he jobsite as required by Title 8. <br /> 3. Detailed description o work to be completed. List components to be re ired or replaced and attach a diagram drawn <br /> to scale showing locatio of repairs and/or replacements. If repairing component, describe how this will be done. (If <br /> adding piping, UDC's, or ther UST equipment, or performing tank op upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for timely plan review): <br /> TCP/IP communications down. .nted ALARM HISTORY nd SETUP. Coldstarted and restored ARCHIVED <br /> SETUP in TLS-350 to reestablished P/IP communica -ons. <br /> 4. List of equipment to be used (Attach manufacturer's specification shee showing third-party approval): <br /> NONE <br /> 2 <br />