My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PETERSEN
>
3663
>
2800 - Aboveground Petroleum Storage Program
>
PR0517463
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 11:41:08 AM
Creation date
10/10/2018 4:21:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517463
PE
2832
FACILITY_ID
FA0010627
FACILITY_NAME
Penske Truck Leasing Co., LP
STREET_NUMBER
3663
STREET_NAME
PETERSEN
STREET_TYPE
Rd
City
Stockton
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
3663 Petersen Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This section must be completed if in-tank gauging equipment is used to perf--n leak detection monitoring. <br /> Complete the followin checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product leve] readings tested? <br /> Cl Yes ❑ No* Was accuracy of system water level readings'tested? <br /> C1Yes LCOI <br /> No* Were all probes reinstalled properly? <br /> ❑ Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the foliowin checklist: <br /> Er Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: Q 3 g.p.h.; ❑ 0.1h <br /> g•P• ❑ 0.2 g.p.h. <br /> Qa Yes ❑ No* Were all LLns coi:finncd.operational and accurate within regulatory requirements? v <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> (W Yes . ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes I j Q No* For electronic LLDs, does the turbine automaticany.shut off if the LLD detects a leak? <br /> ❑ Yes -E3 )For;electronic:LLDs, does the turbine sutomaticall shut off if as <br /> .�r .= ? Y y portion of the monitoring system is disabled <br /> ❑ Yes `o testi . s,does the:turbine automatically shut off if any portion ofthe monitoring system malfunctions <br /> N/A - or fails a ? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 9 N/A <br /> A Yes 1 ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.