My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
401
>
2800 - Aboveground Petroleum Storage Program
>
PR0528236
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2019 9:41:10 AM
Creation date
10/10/2018 4:32:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528236
PE
2832
FACILITY_ID
FA0016613
FACILITY_NAME
RIPON USD-MAINT/OPERATIONS DEPT
STREET_NUMBER
401
Direction
N
STREET_NAME
PINE
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25905014
CURRENT_STATUS
01
SITE_LOCATION
401 N PINE ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL PREVENTION, CONTROL, AND COUNTERMEASURE RULE <br /> A Spill Prevention, Control, Countermeasure(SPCC)Rule applies to owners or operators <br /> of non-transpoftation-related facilities that drill, produce, store, process, refine, transfer, <br /> distribute, use, or consume oil or oil products and could reasonably be expected to <br /> discharge oil to U.S. navigable waters or adjoining shorelines. Ruling, 40 CFR Part 112 <br /> was adopted by the U.S.Environmental Protection Agency. <br /> CERTIFICATION <br /> Ripon Unified School District <br /> Ripon, CA <br /> CERTIFICATION <br /> The Owner and Operator of the subject facility understand the potential risk associated <br /> with their facility and have provided the necessary resources to maintain Spill Prevention <br /> Control,and Countermeasures set forth within this plan. The plan is to be updated every <br /> five years and anytime there is a change to the facility or operation as stated within this <br /> plan. <br /> OWNER: OPERATOR: <br /> t o tai r e JO h n d O h "------ - <br /> moo, .— J`r <br /> SIGNATURE OF OWNER //SIGNATURE OF OPERATOR <br /> �wu�St �b�HSO� <br /> PRINT PRINT <br /> DATE DATE <br /> 1 certify under penalty of law that I have personally examined and am familiar with the <br /> information submitted in this document and all attachments and that,based on my inquiry <br /> of those individuals immediately responsible for obtaining the information, I believe that <br /> the information is true, accurate, and complete. I am aware that there are significant <br /> penalties for submitting false information, including the possibility of fine and <br /> imprisonment. <br /> ENGINEER: e��e�0 EHAON9�F <br /> tib' �G RT �c <br /> PRINTn - UJ C 73837 M <br /> DATE <br /> s <br /> OF 0F�``� <br />
The URL can be used to link to this page
Your browser does not support the video tag.