Laserfiche WebLink
R E <br /> Pressure%lief Valvesare installed and in date NOV 0 7 2016 <br /> Piping isASME schedule 90(threaded)orASME schedule 40(weld�NVIRDNMENTAL HEALTH <br /> Al I piping i s proteded from vehicular damage DEPARTMENT <br /> (� Water pot on top of aqua tank isfull <br /> SCBA's (1--Maintenance Shop, #2--Control Room, #3 &#4---Dock) <br /> 0 Functional checkof SCBA <br /> 0 Alarm worts properly <br /> Regulator functions properly <br /> Face Piece:Clean,not distorted,no tears,no cads <br /> 8 Elastic Parts Pliable and no deterioration <br /> (� Head Harness Clean,no tears,no cads,no misting pieces,no lossof elasticity,and no <br /> wear from buckle <br /> Lens Clean,dear,no cads,sealed to mask <br /> Edialation Valve:Clean,good seal,no tear$and tight <br /> Inhalation Valve:Clean,good seal,no team and tight <br /> Cylinder.No dents or gouges and fits tightly in band <br /> Cyl i nder Fydro Test Date#1 <br /> DEC 2015 <br /> CyA i nder Hydro Test Date#2 <br /> DEC 2015 <br /> Cyl i nder Hydro Test Date#3 <br /> DEC 2015 <br /> Cyl i nder Hydro Test Date#4 <br /> DEC 2015 <br />