Laserfiche WebLink
1 l <br /> ;° ww D wpia t-0t <br /> � se 5,2019 <br /> recs: � a ay, smdam, <br /> e 2 <br /> install gre explosives, boarders, and acplonvu cord within the borehole located inside of <br /> the conductor casing; specific ivfomatiov regaNivgiheprocedures to dcetrvy we11sMW- <br /> g, MW-ing and M W-1 ng are provide in Appends A. Smudmriopalling he c Plous far <br /> performing well blasting are Slagle Din Appendix ti A ill hen berm the explosives, <br /> boortem, and explosive cord, Slagle Drilling Corporhon will then tremic grout the well <br /> the err <br /> aosivescement. Shortly Following enable <br /> perforation <br /> f of the near the o ductr the gnat naex), <br /> the explosives will be detonated to doable will <br /> moon placed <br /> the conductor le up nuaro social <br /> 1. <br /> Fullogender <br /> ground n midguoiwilll l neat a ralpatch will be placed in the borehsurrounding <br /> ad n. to surfaze <br /> grade. The ground languor will thenbe patched m march the surrounding area. <br /> Orher tasks associated with the well deswetura; will be vvvsisrent with the activities <br /> described in the April 2019 Work Plan. <br /> LIMITATIONS <br /> This documenl was prepared in generl aawrdaace with accepted standards of care that <br /> existed at the time this work was per!M. No other warranty, exprexxcd or implied, is <br /> all Conclusions and recommendations are baud on field observations and data <br /> obtained from this work and prvium invealigatians. It should be recognized that <br /> definition and evaluation of geologic coalitions is a difficult and somewhat inexact <br /> science. Judgments lcadingto conclusions endrecomme�Matiovs are BendxallY madewith <br /> an complete knowledge of the subsurface conditions present. More extensive studies <br /> may be performed to cerium uncermwties. this document is solely for the use and <br /> inPormation ofour client unless otherwise acted <br />