Laserfiche WebLink
Aft <br /> V <br /> Tyler McMillan's Well Service, LLC <br /> SOP Well Blasting <br /> 1. Check the :ite for immediate hazards around each wel Ito be destroyed. <br /> 2. Tag the depth ofthe well to be loaded to ensure that the current depth is the same as <br /> the reported depth on the Blast Plan. <br /> 3. Clear the area of unnecessary personnel before prepping the charge. <br /> . Open the day box and remove the products to be used. <br /> 5. Assemble the charge for the well. <br /> 6. Return extra products to the day box. <br /> ]. Lower the charge into the well, pay close attention to ensure the charge is set in the <br /> proper place down hole. <br /> 8. Secure the charge at the surface. <br /> 9. Bring in onlythe personnel required to grout the well. <br /> . Begin the grouting process <br /> 11. Carefully monitor charge placement in the well while grouting to ensure the charge <br /> doesn't float to the surface. <br /> 12. After grouting is complete, clear the grouting personnel from the exclusion zone. <br /> U. Place containment method over well and secure. <br /> 14. Setup and ready the seismograph. <br /> 15. Clear the exclusion zone and shut down any roadways or sidewalks located within the <br /> exclusion zone. <br /> 16, Double check the area to ensure no stragglers have entered the exclusion zone. <br /> 17. Sound the pre firesignal <br /> 18, Issue verbal pre fire warning and begin countdown from 5 <br /> 19. FIRE IN THE HOLEII Detonate charge. <br /> 20. Sound Post-fire signal <br /> 21. Check the seismograph for confirmed trigger if the charge N not physically or audibly <br /> noticeable as detonated. <br /> 22. Remove the containment device <br /> 23. Signal the area as cleared and allow grout personnel to return to the exclusion zone. <br />