Laserfiche WebLink
CERTIFIED UNIFIED PROGRAM AGENCY (COPA) <br /> SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC) PLAN <br /> STATUS REFERRAL FORM <br /> Mail Copy of the completed form: CUPA y <br /> Inspector. q�71 V7iJ <br /> California Regional Water Quality Control Address: <br /> Board 6�� <br /> Attn: D vc C¢CG 10'¢ � �' Ll���ly , CA IT,202 <br /> 020 SU1-J CM 4 r N , If 20D <br /> nG�,O Csr b CA a�(v-70 6"Ll Phone: EP-1) a <br /> Date: 6 / l / 0 <br /> The following facility is storing "petroleum" in a single storage tank greater than 660 gallons or in multiple storage <br /> tanks with a cumulative storage capacity greater than 1,320 gallons. "Petroleum"means crude oil, or any fraction <br /> thereof, which is liquid at 60 degrees Fahrenheit temperature and 14.7 pounds per square inch absolute pressure. <br /> This includes petroleum based substances comprised of a complex blend of hydrocarbons, such as gasoline, <br /> diesel,jet fuels, residual fuel oils, lubricants, some petroleum solvents, and used oils. An example of a substance <br /> that is not"petroleum" is liquid propane gas (LPG). Note: The backside of this form identifies storage tanks and <br /> facilities exempt from the state Aboveground Petroleum Storage Act SPCC requirement <br /> Facility Name: —T*L to 4NV-& �— Mailing Name: <br /> U <br /> Facility Contact: �VQ>t� �� A ( GZ. Mailing Contact: <br /> Contact's Phone Contact's <br /> Number: 2 B'i ` Z. ` D b G Phone Number: <br /> Facility AddressC Mailing Address <br /> (street address) 8 ( J S• E G b erilao (street address) <br /> City F t` �R� C MP City <br /> State/Zip ` S2 3 I State/Zip <br /> 1 <br /> PLEASE SELECT ONE OF THE FOLLOWING: <br /> The facility is not in compliance with H&SC Section 25270.5(c)• a SPCC Plan has not been prepared. <br /> This form constitute a referral to the Regional Board for correction of the following violation. The facility does <br /> / not have a certified SPCC Plan in place. <br /> - OR - <br /> The facility is in compliance with H&SC Section 25270.5(c) the preparation of a SPCC Plan. <br /> ❑ A complete copy of the facility's SPCC Plan, certified by a Registered Professional Engineer, is maintained at <br /> the facility, which is normally attended at least 8 hours per day. If the faiclity is not attended at least 8 hours <br /> per day, the SPCC Plan is maintained at the nearest field office. <br /> ❑ Please check here if a copy of the State Water Resources Control, Aboveground Petroleum Storage Tank <br /> Program brochure was provided to the owner or operator. Additional information rgarding this program can <br /> be found at http://www.swrcb.ca.gov(click on "Tanks/Landfills") <br /> SWRCB,CWP Form ACT-1(06/28/99) <br />