Laserfiche WebLink
tTrIF1ED PROGRAM CONSOLIDATED FOR, <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TY^E OF ACi',ON El1.NF--PLAN 2 CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ).M&AITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 190 <br /> p-�Checl one item only) 'j 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> 1. FACILITY INFORMATION <br /> FACILITY ID#(agenc),Use Onl,) A ==1 - - I <br /> BUSINESS NAME(Same as FACT ITY NAME) 3. <br /> BUSINESS SITE ADDRESS S 103 CITY P-0-- n c-k, 1" <br /> II.EQUIPMENT TESTING AND,PREVENTIVE MAINTENANCE <br /> Testine,preventive maintenance,and calibration of monitoring equipment(e.g..sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR§2632,2634,263&26-41) <br /> MONITORING EQUIPMENT IS SERVICED 14 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> 190-3b <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2-SITE PLOT PL4N/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49u-s <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(IN'TERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 49,>_5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL 4LARMS. (23 CCR§2632 2634) <br /> SECONDARY CONTAINMENT IS: a_DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM J901-4 <br /> --- -- -- -- --- - -- - - ••--•---- <br /> --------------------------------- <br /> J90.7, i J11�-8 <br /> PANEL MANUFACTURER: V 1r-9,A--e---- -�- t MODEL#: t,� <br /> - - - - ------- --------------------- <br /> LEAK SENSOR MANUFACTURER: t 4 I l 49--•-- -MODEL#(S): <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-I1 <br /> PANEL MANUFACTURER 490.13 MODEL#: 490-13 <br /> -----IN-TANK PROBE MANUFACTURER: 490.1; MODEL#(S) -_ 490-13 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 490'(6 <br /> ❑ d.MONTHLY --❑_e.OTHER(Specify): JI(1 17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g-p.h. ❑ b.0.2 g.p-h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-ZD <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a-36 HOURS ❑ b:60 HOURS 490-'-1 <br /> J90--!, <br /> i' 0 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 190-3 <br /> ✓ TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> JJQ-25 <br /> 1%-26 <br /> ❑99.OTHER (Specify): 4W27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> jjg 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT M-14a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM J911'79 <br /> PANEL MANUFACTURER: --�- 490.30 1 MODEL#: 90-3t <br /> 4 <br /> LEAK SENSOR MANUFACTURER: t} ! 490-32 i MODEL#(S):-- <br /> O +90 3, <br /> --- --- - --- ---------------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. *&YES a b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a YES ❑b.NO 490-3' <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TEST9 AND RESTIUCTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN iA LEAK IS DETECTED(23 CCR§2636L---_--- 1h1-36 <br /> ---------------- <br /> MLLD MANUFACI URFR(S):. 1W'? MODEL#( _ a9<7 s <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLd)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR 636) 490.39 <br /> 49---- - - .---- - -=--- - <br /> ELLD MANUFAcl-UkER(S) 490 10' i MODEL#(S): 49ti'1 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-13 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO <br /> 4.PIPE INTEGRITYTESTING4%"s <br /> TEST FREQUENCY ❑ a.ANNUALLY 0 b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49046-4 <br /> Ll 5.VISUAL PIPE MONITORING. <br /> FREQUENCY ❑.a.DAILY ❑.b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED• <br /> ':Allen and for nmitorin unburied ma- or fud.- *Wv HSC 25MI.5(bl(31, <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(ax3)]. <br /> 7.NO REGULATED PIPING PER HEALTH,AND SAFETY CODE,DIVISION 20,CHAPTER 6.71S ONN CTED TO THE TANK SYSTEM <br /> 490-51 <br /> Q 99.OTHER(Specify) <br /> ti- { <br /> ,�, JUN 2 4 Z0116 <br /> \ UPCF UST-D(128007)1/4 \ �'t <br />