Laserfiche WebLink
Tanknology Inc. <br /> i 8501 N.MoPac Expressway,Suite 400 Austin,TX 78759 (800)964-0010 Policy 100-29-A <br /> JOB CLEARANCE FORM & Rev:D <br /> SITE SAFETY CHECKLIST - OVF Revised:8/04/2008 <br /> Site Name/#: Street Address: W.O.# <br /> Arrival Time: Departure Time: Travel Time: Date <br /> rZILIEi� <br /> /E <br /> NFC1=&1=[) <br /> Scope of Work and Tasks Performed(JSA's must be available for all tasks): <br /> JUL 0 201 <br /> Repairs to Equipment or Paris Provided: <br /> ENVIRONMENTAL HEALTH <br /> Follow-up actions required;equipment isolated;comments: PERMIT/�crs FWARONANIEWIAL i IIEc, <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED Check Items used or mark—if not app licable) <br /> ❑ Safety Vest ❑ Safety Glasses ❑ Gloves ❑ Hearing Protection <br /> ❑'' Steel Toe Boots _ ❑ Splash Goggles I ❑ Hard Hat 1 ❑ Other <br /> ✓ PRE-TEST PROCEDURES (Check each Item completed or mark — if not applicable) <br /> 1. D Discuss safety procedures with site personnel. Nearest hospital: <br /> 2. ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. ❑ Secure entire work area with barricades(cones,flags, and caution tape, pennant flags, or other perimeter guard). <br /> 4. ❑ Place fire extinguishers and"No Smoking"signs in the work area. <br /> 5. ❑ Implement Lockout/Tagogt per API 1646 (when accessing product piping during tasks) <br /> ❑ All applicable equipment disabled during test(s). ❑ Secure the circuit breaker(s)with lockout devices and tags. <br /> ❑ Secure nozzles with"Out of Service"bags and nylon ties. ❑ Verify LOTO is complete by trying to operate pumps. <br /> ❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical"bayonet"co hector from the STP(s). <br /> SIGN IN lead Technician Name Lead Technician Signature <br /> General Safety Checks: i <br /> All site personnel have been informed. <br /> Fuel delivery has been informed. Site Representative Name Site Representative Signature <br /> Is a fuel delivery due today? <br /> LOTO procedures have been discussed and agreed. <br /> Work areas barricaded to protect workers,staff&public. I have discussed'ob Clea ance form with techni ian. <br /> POST-TEST PROCEDURES (Check each item completed or mark ~ if not applicable) <br /> 1. ❑ Remove all "Lockout/Tagout"devices. <br /> 2. ❑ Run all pumps and verify there are no leaks: ❑ Impact Valve Test Ports under dispensers <br /> ❑ Leak Detector Threads on STP's ❑ Functional Elements&Relief Screws <br /> 3. ❑ Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: L1 L2 L3 L4 L5 L6 <br /> 4. ❑ Check following components operational: ❑ ATG probes,sensors,&caps <br /> ❑ Ball floats,dry breaks&caps ❑ Cathodic protection operational <br /> ❑ Containment sumps are dry ❑ Dispensers&POS operational <br /> ❑ Dispenser panels are replaced ❑ Drop tubes,fill adapters&caps <br /> ❑ Leak detectors&vent tubes ❑ Manhole covers and sump lids <br /> ❑ Monitoring system is operational ❑ Shear valves are open <br /> ❑ Siphon lines and manifold valves ❑ Siphon lines and manifold valves_ <br /> ❑ STP fittings and bayonet connectors ❑ Vents(not capped, plugged 'r isolated) <br /> 5. _Remove barricades. ___ __ <br /> SIGN OUT&Operator Verification of Work(OVF)_ Lead Technician Name \ Lbad Technician Signature <br /> General Safety Checks: <br /> Work area has been left tidy&safe. <br /> Site staff are aware of work status including any remaining isolation. Site Representative Name Site Representative Signature <br /> Changes to equipment are documented and communicated. <br /> All incidents,near incidents,and unsafe situations reported. <br /> Site Representative Comments: <br /> r <br /> COMPANY CONFIDENTIAL ©Tanknology Inc.,2011.All Rights Reserved. <br /> rinted copies of this document are uncontrolled. The current version is available in the Tanknology On-Line Document Control S stem. <br />