My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7501
>
2800 - Aboveground Petroleum Storage Program
>
PR0539001
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:46 AM
Creation date
10/11/2018 1:57:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0539001
PE
2832
FACILITY_ID
FA0022384
FACILITY_NAME
Eleventh Street Chevron
STREET_NUMBER
7501
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
Tracy
Zip
95304
APN
25014017
CURRENT_STATUS
01
SITE_LOCATION
7501 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EC, 1V E D <br /> Statement in Support of"Return to Compliance" ®vr 19 209 <br /> Item No. Corrections Undertaken ENVIRONMENTAL HEALTHPER)IMSEMP-ES <br /> 203 New SPCC Plan has been written, which,when signed, shall be <br /> implementation by Management of W. 11th St.Chevron,of the SPCC Plan <br /> 603 New SPCC Plan contains adequate descriptions of the facility, in addition to <br /> satellite view&diagram of the facility. (Diagram attached with locations of <br /> petroleum storage) <br /> 604 Identification of each petroleum storage type&capacity specifically made in <br /> SPCC Plan. Specific requirements for SPCC Plan addressed in new SPCC Plan. <br /> 609 New SPCC Plan has specific items listed and addressed in this section. <br /> 613 All Containers have secondary containment, including the(8)55 gal. drums <br /> with new product contained in them. A secondary pallet with 66 gal. <br /> containment capacity has been purchased &installed for each 4 drums. (See <br /> pics.) <br /> 618 New regimen of inspections are determined by new SPCC Plan,tanks subject <br /> to current testing(Containment Solutions ASTs) have been tested. Testing <br /> schedule of Fuel tanks established and proper Inspection forms are currently <br /> being utilized. <br /> 619 Training has begun,with Debbie Jutla,Owner, being the first person trained <br /> to Hazwoper Training requirements(40 hr). If the training undertaken meets <br /> with Debbie Jutla's approval,then all people required to be trained shall be so <br /> trained,to the same level and subsequently with 8 hr annual refresher <br /> courses. <br /> 620 New SPCC Plan designates CJ Jutla as"person responsible." <br /> 622 Discharge briefings are scheduled for once per year, beginning after Debbie <br /> Jutla completes her training, but no later than December 15 of each year. <br /> 714 Owner/Operator has temporarily closed the Smog&Service section of the <br /> facility. As such,there is no activity whatsoever in this section currently <br /> underway. At such time of filling the 55 gallon drums, on site personnel shall <br /> personally observe the filling of the drum(s)with the small bung removed and <br /> a light illuminating the filling of the product thru that point, in order to <br /> observe product levels& prevent overfills. If there is a device available, it <br />
The URL can be used to link to this page
Your browser does not support the video tag.