Laserfiche WebLink
FaeiW Employee Training Paste 2 of 2 <br /> All facility employees have received the required on-the-job trsiniuog within the past year. X <br /> All facility employees hired within the pest 30 days have received the required an the job training. X <br /> Monthly Io chiom— <br /> Y N NA Date Done <br /> Monitoring system certification(whbiin past 12 months) X 12/13/16 <br /> Spill Bucket testing completed(within past 12 months) X AST <br /> Leak Detector-mechen,icai/electmnic for most sites(within past 12 months) 12/13/16 <br /> The above are usually done together on an annual basisfor local regulator. <br /> )rine Tightness(usually upon construction or when no positive shutdown) X 10/12/17 <br /> Tank Tigbtnew(Usually only after construction or when using SIR) X <br /> Secondary contab went(SB989)tests have been completed(usually every 3 years) X A S T <br /> Other testing or maintenance completed as required list them below: <br /> TestUainte mce:A Q M D X 8/2212017 <br /> TeAlftintmance: <br /> Test/Maimcname: <br /> PRINTOUT INCLUDED: Yes® No ❑ NA❑ PRINTOUT LEFT ON SITE: Z BMILR UP TO DATE: <br /> Comments:NO ALARMS OUTSIDE OF TANK SYSTEM ONE INTERNAL VAPOR POT ALARM CLEARS ITSELF <br /> LM TESTING PERFORMED WITH SITE INSPECTION TODAY. <br /> Items Requiring Follow-up Actions: <br /> rne+ C <br /> nr <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months.records must be maintained on-site or,if approved by the local agency,off-site at a readily <br /> available location. <br /> 99/79/75 <br />