Laserfiche WebLink
Faeflity Employee Training e 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. <br /> All facility employees hired within the past 30 days have received the required on the job ttuining. x <br /> Monthly Ims ec-don.— <br /> Y N NA Date Done <br /> Monitoring system.certification(within past 12 months) X 12-13-16 <br /> Spill Bucket testing completed(within past 12 months) X AST <br /> Leak Detector-mechanicaVelecttonie for most sites(within past 12 months) X 12-13-16 <br /> The above are usually done together on an annual basis for local regulator. <br /> Line Tie tress(usually upon construction or when no positive shutdown) g <br /> Tank Tightness(Usually only after construction or when using SIR) x <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) X AST <br /> Other testing or maintenance completed as required List them below; <br /> Test/Maintmncc:,A.QMD X 8-29-16 <br /> Test/Maintenance: <br /> Test/Maintenance- <br /> PRINTOUT LEFT ON SITE: BIN ER UP TO DATE: <br /> Comments: NO ALARMS <br /> Items?,Muiring FoHow-up Actions:N/A ENVIFc0;,� `v-Ai_HEAL'I H <br /> Monthly inspection must be conducted by an TCC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months.Records must be maintained on-site or, if approved by the local agency,o££--site at a readily <br /> available location. <br /> 99/79 <br />