Laserfiche WebLink
Facili Employee TrainingPa e 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. x <br /> All facility employees hired within the past 30 days bave received the required on the job training. �( <br /> Mon Ins ' n— <br /> Y N NA Date Done <br /> Monitoring system certification(within past 12 months) X 12-13-16 <br /> Spill Bucket testing completed(within past 12 months) X AST <br /> Leak Detector-mechanical/electronic for most sites(witbin past 12 months) X 12-13-16 <br /> The above are usually done together on an annual basis for local regulator. <br /> Line Tightness(usually upon construction or when no positive shutdown) X <br /> Tank Tigbwess(Usually only after construction or when using SIR) X <br /> Secondary containment(513989)tests have been completed(usually every 3 years) X AST <br /> Othertesting or maintenance completed as required List them below: <br /> Test/Maintenance:AQMD X 8-29-16 <br /> Test/Maimtetta�uce: <br /> TesyNiabAcnance: <br /> PRINTOUT LEFT ON SITE: ZRINDER UP TO DATE: <br /> Comments: NO ALARMS <br /> Items Requiring Follow-up Actions:N/A <br /> Monthly inspection must be conducted by an TCC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months. Records must be maintained on-site or, if approved by the local agency,off-site at a readily <br /> available location. <br /> 99/'79 <br />