Laserfiche WebLink
FacHity Employee Training Page 2 of 2 <br /> All facility employees have received the required on-the-job trainiuug within the past year. X <br /> All facility employees hired within,the past 30 days have received the required on the job training. X <br /> MOB Ins 'ora— <br /> Y N NA Date Done <br /> Monitoring system,certi6eation(within.past 12 months) X 12-13-16 <br /> Spill Bucket testing completed(within past 12 amths) X AST <br /> Leak Detector-m,eehanieal/electromic for most sites(within past 12 months) X 12-13-16 <br /> The above are usually done together on an annual basis for local regulator. <br /> Line Tigbtaess(usually upon construction or when no positive shutdown) X <br /> Tank Tightness(Usually only atter court action or when using SM) X <br /> Secondary containment(SB999)tests have been completed(usually every 3 years) X AS's' <br /> Other testing or maintenance completed as required.List them below: <br /> TestlMaintewmce:AQMD X 8-29-16 <br /> Test(Maintenance: <br /> TesVMaintenance: <br /> PRPP 'OUT INCLUDED: Yes g No 0 NAE]PRINTOUT LEFT ON SITX:®BINDER UP TO DATE: <br /> Comtmexib: NO ALARMS <br /> L JiROPNTALHIEF113H <br /> Items Brquiring FoHow-up Actions:NIA <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months.Records must be maintained on-site or, if approved by the local agency,off-site at a readily <br /> available location. <br /> 99/79 <br />