Laserfiche WebLink
Facility Employee Training Pa e 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. X <br /> All facility employees hired within the past 30 days have received the required on the job training. X <br /> !Month Inspection— <br /> Monitoring system certification(within past 12 months) Y N I NA I Dare Gone <br /> X 12-16-15 <br /> Spill Bucket tcsting completed(within past 12 months) X AST <br /> Leak Detector-mechanical/electronic for most sites(within past 12 months) X AST <br /> The above are usually done together on an annual basis fot local regulator. <br /> Line Tightness(usually upon construction or when no positive shutdown) X <br /> pan_Tightness(Usually only atter construction or when using SIR) X <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) X AST <br /> Other testing or maintenance completedas required List them below: <br /> Te st/Maintenance;AQMD X $-29-16 <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> PRINTOUT INCLUDED: Yes® No ❑ NADPRfNTOUT LEFT ON SITE:MM[NDER UP TO DATE: <br /> Comments: <br /> Items RequirinZ Follow-up Actions:NIA <br /> 3 <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months.Records must be maintained on-site or, if approved by the local agency,off-site at a readily <br /> available location. <br /> 99!79 <br /> .s <br />