Laserfiche WebLink
Fneffift Fm to ee Training Pa e 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. X <br /> All facility employees hired within the past 30 days have received the required on the job training. X <br /> Monthly Inspection— <br /> Y 7 N NA Date Done <br /> Monitoring system certification(within past 12 months) X 12-16-15 <br /> Spill Bucket testing completed(within past 12 months) X AST <br /> Leak Detector-mechanicallclectrmic for most sites(within past 12 moutbs) X AST <br /> The above are usually done together on an annual basis for local regulator. <br /> Lane Tightness(usually upon construction or when no positive shutdown) X <br /> Tank Tightness(Usually only after construction or when using SIR) X <br /> Secondary containment(SB989)tests bave been completed(usually every 3 years) AST <br /> Other testing or maintenance completed as required List them below: <br /> Test/Maintenance: <br /> TestlMaintenance: <br /> Test/Maintenance: <br /> PRINTOUT INCLUDED Yes® No LJ NA LJ <br /> Conammft L6 SEPT 4 VAPOR POT <br /> Items Requiring Follow-up Actions: <br /> Monthly inspection must be conducted by an JCC licensed Designated Operator, <br /> A COPY of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may.require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months.Records must be maintained on-site or,if approved by the local agency,off-site at a readily <br /> available location. <br />