Laserfiche WebLink
Facility EmPl2yee Training Pa e 2 of 2 <br /> All facility employees have received the required on-the-job traitzirag within the past year. X <br /> All facility employees Wred within the past 30 days have received the required On the job training. X <br /> Monthly Inspection— <br /> X N NA Date Dome <br /> Monitoring system,certification(withiat past 12 months) 6-15 <br /> 1 <br /> 12- <br /> Spill Bucket testing completed(within past 12 months) � AST-1 <br /> Leak Detector-mechanical/electronic for most sites(within past 12 months) X AST <br /> The above are usually done together on an annual basis for local regulator. <br /> Line Tightness(usually upon construction or when no positive shutdown) X <br /> Tank Tightam(Usually only after conswaction or when using SIR) x <br /> Secondary containment(S1i989)tests have been completed(usually every 3 years) AST <br /> Other testing or maintenance completed as required List them below. <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> TestMaintenance: <br /> PRINTOUT INCLUDED Yes Z No ;�:NA <br /> Comments: <br /> Items Requiring Follow-up Actions: <br /> Monthly inspection must be conducted by an TCC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator Roust maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months. Records must be maintained on-site or, if approved by the local agency,off-site at a readily <br /> available location. <br />