Laserfiche WebLink
Facility Employee Training_ Pa e 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. X <br /> All facility employees hired within the past 34 days have received the required on the job training. g <br /> Monthly Inspection— <br /> Aanc <br /> Monitorivag system certification(withig past 12 months) Y N NA Rate X 12e Dont <br /> 15 <br /> Spill Bucket testing completed(within past 12 months) X AST <br /> Leak Detector-mechanical/electronic for most sites(within past 12 months) X AST <br /> The above are usually done together on an annual basis for local regulator. <br /> Line Tightness(usually upon construction or when no positive shutdown) g <br /> Tank Tightness(Usually only after construction or when using SIR) X <br /> Secondary containment(SB989)tests have been completed(usually every 3 yews) X AST <br /> Other testing or maintenance completed as required,List them below: <br /> Test/Maiiatenance: <br /> Test/Maintenance: <br /> Test/Maixatenmce: <br /> PRINTOUT INCLUDED: Yea❑ No ❑ NA®PRINTOUT LEFT ON SITE:X BINDER UP TO DATE: <br /> Comments:ABOVE GROUND TANKS <br /> Items Requiring Follow-up Actions: <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that xnay require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months. Records must be maintained on-site or,if approved by the local agency,off-site at a readily <br /> available location. <br /> 99/79 <br />