My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2300 - Underground Storage Tank Program
>
PR0231345
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 1:00:51 PM
Creation date
10/11/2018 2:24:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231345
PE
2381
FACILITY_ID
FA0003713
FACILITY_NAME
CHEVRON #95775 MCCOMBS* (INACT)
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vw�tS <br />STATE OF CALIFORNIA <br />STATE WATER RESOURCES CONTROL BOARD i g <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br />m� <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY ❑ 1 NEW PERMIT <br />❑ <br />3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION <br />❑ 7 PERMANENTLY CLOSED ON SITE <br />ONE ITEM ❑ 2 INTERIM PERMIT <br />❑ <br />4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE <br />® 6 TANK REMOVED <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />CHEVRON SERVICE STATION 301 W. KETTLEMAN LANE, LODI <br />I. TANK DESCRIPTION COMPLETE ALL ITEMS – SPECIFY IF UNKNOWN <br />A. OWNER'S TANK I. D. N 2171 <br />B. MANUFACTURED BY: X E R X E S <br />C. DATE INSTALLED (MO/DAYNEAR) 1983 <br />D. TANK CAPACITY IN GALLONS: 10,000 <br />II. TANK CONTENTS IF A-1 IS MARKED, COMPLETE ITEM C. <br />q. ® 1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />❑ 2 PETROLEUM ❑ 80 EMPTY <br />❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN <br />B. <br />® 1 PRODUCT <br />❑ 2 WASTE <br />C 1a REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br />❑ ib PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br />❑ 1c MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ B M85 <br />❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM 0. BELOM <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C. A. S. #: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A, B. AND C, AND ALL THAT APPLIES IN BOX D AND E <br />A. TYPE OF <br />❑ 1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br />SYSTEM <br />2 SINGLE WALL <br />❑ 4 SINGLE WALL IN A VAULT <br />❑ 99 OTHER <br />B. TANK <br />❑ 1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />a] 3 FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 6 1GO% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />C. INTERIOR <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />LINING OR <br />❑ 5 GLASS LINING <br />❑ 6 UNLINED <br />❑X ( 95 UNKNOWN <br />❑ 99 OTHER <br />COATING <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES— NO— <br />5 UNKNOWN <br />D. EXTERIOR <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />CORROSION <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />E995 UNKNOWN <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL, etc. SPILL CONTAINMENT INSTALLED (YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) <br />DROP TUBE YES NO STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND, BOTH IF APPLICABLE <br />A. SYSTEM TYPE <br />Qc1 <br />SUCTION <br />A U <br />2 PRESSURE <br />A U <br />3 GRAVITY A U <br />4 FLEXIBLE PIPING A U 99 OTHER <br />B. CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A U <br />2 DOUBLE WALL <br />A U <br />3 LINED TRENCH AZI95 <br />UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />A U <br />1 BARE STEEL <br />A U <br />2 STAINLESS STEEL <br />A U <br />3 POLYVINYL CHLORIDE (PVC)A U 4 FIBERGLASS PIPE <br />CORROSION <br />A U <br />5 ALUMINUM <br />A U <br />6 CONCRETE <br />A U <br />7 STEEL W/ COATING <br />A U 8 100% METHANOL COMPATIBLE W/FRP <br />PROTECTION <br />A U <br />9 GALVANIZED STEEL <br />A U <br />10 CATHODIC PROTECTION <br />5 UNKNOWN <br />A U 99 OTHER <br />D. LEAK DETECTION <br />❑ <br />1 MECHANICAL UNE LEAK <br />❑ <br />2 LINE TIGHTNESS 3 CONTINUOUS <br />❑ <br />INTERSTITIAL E:]4 ELECTRONIC UNE <br />❑ ❑ <br />5 AUTOMATIC PUMP �yy <br />^ T 99 OTHER I I N K N DI N <br />DETECTOR <br />TESTING <br />MONITORING <br />LEAK DETECTOR <br />SHUTDOWN I <br />V. TANK LEAK DETECTION <br />❑GROUND WANUAL <br />1 VISUAL CHECK ❑ 2MANUAL RECONCILII TIONVENTORY ❑ 3 MONITORING ❑ VADOZE4 GAUG NGAUTOMATIC TANK ❑ 5 MON TORINGTER ❑ 6 TESTINGTANK <br />❑ 7 MONITORING INTERSTITIAL [_]8 SIR ❑ 9 WEEK LY M <br />GAUGING <br />❑ 10 MONTESTHLY TANK 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION (PERMANENT CLOSURE IN-PLACE) <br />1. ESTIMATED DATE LAST USED (MO/DAYNR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES ED NO ❑ <br />T 1 11 V 31 , l q q R SUBSTANCE REMAINING 51�1. q(� LONS INERT MATERIAL? <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />TANK OWNER'S NAME I DATE <br />(PRINTED a SIGNATUR BRYAN H. MUSCO FOR CHEVRON 7/13/98 <br />LOCAL AGENCY USE 0 LY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # TANK # <br />STATE I.D.# m <br />PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br />THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION - FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br />SHOULD BE ACCOMPANIED BY A PLOT PU '.E THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE V 'GROUND STORAGE TANK REGULATIONS <br />FORM B (6-95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.