My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
14201
>
2800 - Aboveground Petroleum Storage Program
>
PR0516683
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:08:20 AM
Creation date
10/11/2018 2:46:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516683
PE
2831
FACILITY_ID
FA0001516
FACILITY_NAME
UNION POINT MARINA BAR & GRILL INC
STREET_NUMBER
14201
Direction
W
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
13113005
CURRENT_STATUS
01
SITE_LOCATION
14201 W HWY 4
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U.S. ENVIRONMENTAL PROTECTION AGENCY <br /> SPCC FIELD INSPECTION AND PLAN REVIEW CHECKLIST <br /> m <br /> �ygy <br /> r"�1,nfl•^s�q.�- '"i f "�7s`����������wu'����r'���G+R�'y r�xQMVr/I141L.,�F� QY�k�IAr'- �If`—iN. 0 <br /> ?'�rir'�W:lti��4�',/g'✓a Y� hxXi,���s .�..��� ��,.,�.�a'�„�Ge%"ay r?73`'S,+°Ca��.��,,,L�"L~ "�'��4y'�'�''3:3�Y��5;:,�C.�'�Slr��,.:>2i.';%..�.�,iyr.�.k'�` <br /> Overview of the Checklist <br /> This checklist is designed to assist EPA inspectors in conducting a thorough and nationally consistent inspection of a <br /> facility's compliance with the Spill Prevention, Control, and Countermeasure (SPCC) rule at 40 CFR part 112. It is a <br /> required tool to help federal inspectors (or their contractors) record observations for the site inspection and review of the <br /> SPCC Plan. While the checklist is meant to be comprehensive, the inspector should always refer to the SPCC rule in its <br /> entirety, the SPCC Regional Inspector Guidance Document, and other relevant guidance for evaluating compliance. This <br /> checklist must be completed in order for an inspection to count toward an agency measure (i.e., OEM inspection <br /> measures or GPRA). The completed checklist and supporting documentation (i.e. photo logs or additional notes) serve as <br /> the inspection report. <br /> This checklist addresses requirements for Tier I Qualified Facilities that meet the eligibility criteria set forth in §112.3(g)(1). <br /> F�✓i �7r- *��.,p+a .s�s- x; ex'�^r >-,.�..' <br /> Se ' rand standalone checklists address;the:regUiremerts for> W .,. <br /> Onshore facilities includg Tier If Qualified Facilities(e)cluding oil drilling, production andworkquerfaei fti�s)�� _:, <br /> ��_.•r-.»�} Com. <br /> Onshore oil drilling;produation and workover facili 6s including Tier II Qualified Facilities as defined rn §112 3(g)(2); <br /> and <br /> Offshore drilling, production and workover facilities <br /> Tier I Qualified Facilities must meet the rule requirements in §112.6 and other applicable sections specified in §112.6. The <br /> checklist is organized according to the SPCC rule. Each item in the checklist identifies the relevant section and paragraph <br /> in 40 CFR part 112 where that requirement is stated. <br /> Sections 112.1 through 112.5 specify the applicability of the rule and requirements for the preparation, <br /> implementation, and amendment of SPCC Plans. For these sections, the checklist includes data fields to be <br /> completed, as well as several questions with "yes," "no" or"NA" answers. <br /> Section 112.6 includes requirements for Tier I qualified facilities. <br /> • Section 112.7 includes general requirements that apply to all facilities (unless otherwise excluded). <br /> Attachments <br /> • Attachment A is a checklist for Sections 112.8 and 112.12. This checklist specifies requirements for spill <br /> prevention, control, and countermeasures for onshore facilities (excluding oil production facilities). <br /> • Attachment B is a checklist that specifies requirements for spill prevention, control, and countermeasures for <br /> onshore oil production facilities (112.9 provisions) and onshore drilling and workover facilities (112.10 provisions) <br /> • Attachment C is for recording information about containers and other locations at the facility that require <br /> secondary containment. <br /> • Attachment D is a checklist for documenting the tests and inspections the facility operator is required to keep with <br /> the SPCC Plan. <br /> • Attachment E is a checklist for oil spill contingency plans following 40 CFR 109. Unless a facility has submitted a <br /> Facility Response Plan (FRP) under 40 CFR 112.20, a contingency plan following 40 CFR 109 is required if a <br /> facility the owner or operator of a facility with qualified oil-filled operational equipment chooses to implement <br /> alternative requirements instead of general secondary containment requirements as provided in 40 CFR 112.7(k). <br /> • Attachment F is for recording additional comments or notes. <br /> • Attachment G is for recording information about photos. <br /> The inspector needs to evaluate whether the requirements in the checklist are addressed adequately or inadequately in <br /> the SPCC Plan and whether it is implemented adequately in the field (either by field observation or record review). For <br /> the SPCC Plan and implementation in the field, if a requirement is addressed adequately, mark the"Yes" box in the <br /> appropriate column. If a requirement is not addressed adequately, mark the"No" box. If a requirement does not apply to <br /> the particular facility or the question asked is not appropriate for the facility, mark as"NA". Discrepancies or descriptions <br /> of inspector interpretation of"No"vs. "NA" may be documented in the comments box subsequent to each section. If a <br /> provision of the rule applies only to the SPCC Plan, the "Field" column is shaded. <br /> Space is provided throughout the checklist to record comments. Additional space is available as Attachment F at the end <br /> of the checklist. Comments should remain factual and support the evaluation of compliance. <br /> Tier/Qualified Facilities Page 1 of 8 June 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.