Laserfiche WebLink
❑ Plan has inadequate or no facility diagram, - 112.7(a)(3) ..................................................................75.00 <br /> ❑ Inadequate or no listing of type of oil and storage capacity of containers - 112.7(a)(3)(i)...........................50.00 <br /> ❑ Inadequate or no discharge prevention measures - 112.7(a)(3)(ii).......................................................50.00 <br /> ❑ Inadequate or no description of drainage controls- 112.7(a)(3)(iii)....................................................50.00 <br /> ❑ Inadequate or no description of countermeasures for discharge discovery, <br /> response and cleanup- 112.7(a)(3)(iv)......................................................................................50.00 <br /> ❑ Methods of disposal of recovered materials not in accordance with legal requirements- 112.7(a)(3)(v).........50.00 <br /> ❑ Inadequate contact list&phone numbers for response&reporting discharges- 112.7(a)(3)fvi)...................50.00 <br /> ❑ Plan has inadequate or no information and procedures for reporting a discharge - 112.7(x)(4)...................100.00 <br /> ❑ Plan has inadequate or no description and procedures to use when a discharge may occur- 112.7(a)(5) <br /> .....150.00 <br /> ❑ Inadequate or no prediction of equipment failure which could result in discharges - 112.7(b)....................150.00 <br /> ❑ Plan does not discuss and facility does not implement appropriate containment/diversionary <br /> structures/equipment- 112.7(c)........................................................................................................400.00 <br /> ❑ Inadequate containment or drainage for Loading Area- I/2,7(c) ....................................................400.00 <br /> ❑ Plan has no or inadequate discussion of any applicable more stringent State rules,regulations, <br /> andguidelines-112.7(1) ......................................................................................................75.00 <br /> ❑ Plan-does not include a signed copy of the Certification of the Applicability of the Substantial Harm <br /> Criteria per 40 CFR Part 1 I2.20(e) .........................................................................................150.00 <br /> -If claiming impracticability of appropriate containment/diversionary structures: <br /> ❑ Impracticability has not been clearly denoted and demonstrated in plan- 112.7(d).................................100.00 <br /> ❑ No periodic integrity and leak testing- 112.7(d)..........................................................................150.00 <br /> ❑ No contingency plan- 112.7(d)(1)..........................................................................................150.00 <br /> ❑ No written commitment of manpower, equipment, and materials - 112.7(d)(2).....................................15.0.00 <br /> ❑ Plan has no or inadequate discussion of general requirements not already specified- 112.7(j).....................75.00 <br /> QUALIFIED FACILITY REQUIREMENTS: §112.6 <br /> ❑ Qualified Facility: No Self certification- I 12.6(a).....................................................................450.00 <br /> ❑ Qualified Facility: Self certification lacks required elements - 112.6(a)or(b) ....................................100.00 <br /> ❑ Qualified Facility: Technical amendments not certified- 112.6(a) or(b)............................................150.00 <br /> ❑ Qualified Facility: Qualified Facility Plan includes alternative measures not certified by <br /> licensed Professional Engineer- 112.6(b).................................................................................150.00 <br /> Page 2 of 6 <br />