My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2300 - Underground Storage Tank Program
>
PR0231345
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:40:56 PM
Creation date
10/11/2018 2:50:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231345
PE
2381
FACILITY_ID
FA0003713
FACILITY_NAME
CHEVRON #95775 MCCOMBS* (INACT)
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROBCRT HE LEE & ASSOPIATEr% INC. <br />ARCHITECTURE PLANNING ENGINEERING <br />1137 NORTH MOOOWELL BOULEVARO <br />['7071765-16813 <br />BRIAN F. ZITA <br />Architect <br />JOHN W. JOHNSON <br />Architect <br />GEORGE H. MILLS June 26, 1991 <br />Architect <br />JAMES H. RAY <br />Civil Engineer <br />San Joaquin County <br />Environmental Health Department <br />1601 E. Hazelton Drive <br />Stockton, CA 95205 <br />Ms. Tish Resch <br />(209) 468-3420 <br />RE: CHEVRON USA, INC. <br />301 W. KETTLEMEN LANE <br />LODI, CA 95240 <br />RHL JOB #8663 <br />Dear Ms. Resch: <br />PETALUMA, CALIFORNIA 946641469 <br />FAX [707] 7615-6908 <br />JUN <br />EN V/,y NN 8 '991 <br />PERMIT ISERVJCEAC TH <br />ES <br />We are proceeding with plans for the reconstruction of a petroleum facility at the <br />above location. Attached are two prints showing the proposed site layout. <br />These plans are scheduled to be finalized by July 10, 1991. We would appreciate <br />receiving a written response to the following items for developing our Construction <br />Documents on or before this date. <br />1) Are Phase I (fill) and/or Phase II (dispensers) vapor recovery systems <br />required? <br />2) Is any secondary containment required for vent or vapor recovery piping at <br />this time? <br />3) Are sample wells required in the immediate vicinity of the underground tanks? <br />4) Do you anticipate any change in regulations in the near future which could <br />affect our projects? <br />5) Please send us your current regulations/guidelines and forms for underground <br />tank permits. <br />6) Please also advise if any other agency should be contacted for their <br />involvement in the permit process. <br />OFFICES: LARKSPUR, CA BACRAMENTO, CA BELLEVUE, WA PHOENIX, AZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.