My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2300 - Underground Storage Tank Program
>
PR0231345
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:40:56 PM
Creation date
10/11/2018 2:50:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231345
PE
2381
FACILITY_ID
FA0003713
FACILITY_NAME
CHEVRON #95775 MCCOMBS* (INACT)
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROBERT H. LEE & ASSOCIATES, INC. <br />ARCHITECTURE PLANNING ENGINEERING <br />1310 COMMERCE STREET, PETALUMA, CA 94952 (707) 765-1660 <br />October 10, 1989 <br />Public Health Services <br />Environmental Health Services <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />Attn: Ms. Kasey Foley, REHS <br />RE: CHEVRON USA, INC. <br />301 WEST KEITLEM LANE <br />LODI, CA <br />SS #5775 <br />Dear Ms. Foley: <br />This letter is a standard procedure for our office. I would <br />appreciate your review and written response, even if you gave me <br />several answers over the telephone already. <br />We are proceeding with plans for the remodeling of a petroleum <br />facility at the above location. Attached are two prints showing <br />the proposed site layout. <br />These plans are scheduled to be finalized by October 20, 1989. We <br />would appreciate receiving a written response to the following <br />items for developing our Construction Documents on or before this <br />date. <br />Please note that the existing tanks will remain. New multi -pump <br />dispensers and pipes to the tanks will be installed. <br />1) Is any secondary containment for product piping, and/or <br />vapor return piping required at this time? <br />2) If required, are fiberglass trench liners acceptable for <br />secondary containment on product and/or vapor return piping? <br />3) Are Phase I (fill) and/or Phase II (dispensers) vapor <br />recovery systems required? <br />4) Is a containment box required around the tank fill pipe in <br />case of overfill? If yes, then what is minimum capacity? <br />BRANCHES: LARKSPUR, CA [41 5) 461 -8890 0 SACRAMENTO, CA [91 6) 646-4003 9 PHOENIX, AZ [602) 495-1920 <br />
The URL can be used to link to this page
Your browser does not support the video tag.