My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2300 - Underground Storage Tank Program
>
PR0231345
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:40:56 PM
Creation date
10/11/2018 2:50:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231345
PE
2381
FACILITY_ID
FA0003713
FACILITY_NAME
CHEVRON #95775 MCCOMBS* (INACT)
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPACITY 10000 K PRECISION UNDERGROUND 'TANK TEST I NK RESULTS LTS Patcint Pending <br />TANK * Regular PACE 5 <br />STAT # 95775 TEST PROCHIJURES <br />TEST DATE: 00/22/09 Copyright. 1985 <br />NDX TECIINO:LOClY, INC. PROPRIETARY <br />1. Piping Pressure Tesi N/_1 <br />2. Pneumatic Pressure Drr t a <br />Amount of pressure al p I i e ii <br />to system: NIA <br />3. Amount or pressures drop if any: N/A <br />1. Amount or time elapsed during the test N/A <br />5. Piping Pressures ` mst: Leak Rate is N/A <br />If computer in used see compu t yr pr:i n l oul. or l onkage rale: and all <br />test parameters on Test Results, Parl. IV, Pnge 11, L2 <br />Test. resultn or storage.: systems that, uMixe pros uri.zed piping <br />systems wi l 1 nut. be recognized Curless the turhkne pump is <br />acl ivaL d arter the completion or a s"cc•essful sya.tem test <br />G. Was turbine pump activated? N/A <br />7. Pressure piping syslems shrill be tested under actual operating <br />pressures, and statement describing results must be inc'lude'd. <br />See #.l Above <br />8. If applicable, has the: isolation procedure in addition to the <br />product line been completed? N/A <br />NDV M"NOLOCY, INC. l'110VUHTARY <br />WATT INC. 3121 FA I PHAVVN DRIVE, 1,AI ERSFiELD, CA 9130 '8051 A22-9827 <br />
The URL can be used to link to this page
Your browser does not support the video tag.