My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2300 - Underground Storage Tank Program
>
PR0231345
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:40:56 PM
Creation date
10/11/2018 2:50:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231345
PE
2381
FACILITY_ID
FA0003713
FACILITY_NAME
CHEVRON #95775 MCCOMBS* (INACT)
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPACITY 10000 g PRECISION UNDERGROUND TANK TESTING RESULTS Patent. Pending <br />TANK <br /># Unleaded <br />PAGE 5 <br />S`I'A`1' <br /># 95775 <br />TEST PROCEDURES <br />TEST <br />DATE: 08/22/89 <br />Copyright 1985 <br />NDX <br />TECHNOLOGY, INC. PROPRTETARY <br />1. <br />Piping Pressure 'fest. - <br />N/A <br />2. <br />Pneumatic Pressures Data <br />Amount of pressure <br />applied <br />to system: <br />N/A <br />-. 3. <br />Amount of pressure chop <br />if any: <br />N/A <br />4. <br />Amount of time e1 upsed <br />during the lost <br />N/A <br />5. Piping Pressure Test Leek Rata is N/A <br />If c nmpuLer in used see computer printout of leakage ruler and & <br />Lost parameters on Test Results, Part. 1:V, Page 11., 12 <br />Test results of storage sysLems Lhni utilize pressurized piping <br />systems will not be recognized unless the turbine, pump is <br />nctivned after the romplet:i.un of a sucrvssful s,ysLem least <br />6. Was turbine pump activated'? NIA <br />7. Pressure Piping; systems shall he tested under- actual operating <br />pressures, and statement describing results must be included. <br />See #1 Above <br />ti. If applicable, has the isoLation procedure in addition to the <br />Product. line been completed? N/A <br />NOE 'TECHNOLOGY, INC. PROPU t ETARY <br />WATT INC. 3131 FAIT{HAVEN MUIVE, RAKEUSPIELl], CA 03.30} (1305) :322-OH27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.