My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2300 - Underground Storage Tank Program
>
PR0231345
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:40:56 PM
Creation date
10/11/2018 2:50:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231345
PE
2381
FACILITY_ID
FA0003713
FACILITY_NAME
CHEVRON #95775 MCCOMBS* (INACT)
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPACITY 10000 g PRECISION UNDERGROUND TANI( 'GESTIN(; RES(I.1"I'S Patent Pending <br />_TANK # Supreme PAGE 5 <br />STAT # 95775 TEST PROCEDURES <br />TEST DATE: 08/22/89 Copyright 1985 <br />NDE TE.CIINOLOCY, INC. PROPRIETARY <br />1. Piping Pressure Test - N/A <br />2. Pneumatic: Pressure: Data <br />Amount of pressure applied <br />to system: N/A <br />3. Amount of pressure drop if any: N/A <br />4. Amount. of time elapse:cl during the test N/A <br />5. Piping Pressure 'fest Leak Rate is N/A <br />If computer is used see computer printout of lealiage rate: and all <br />test parameters on Test Results, Part IV, Page 11, 12 <br />Test results of storage systems that utilize pressurized piping <br />systems will not be recognized unless the turbine pump is <br />activated after the completion of a successful system test: <br />6. Was turbine pump activated? N/A <br />7. Pressure piping systems shall be tested under actual operating <br />pressures, and statement. describing results must be, included. <br />See #1 Above <br />8. If applicable, has the isolation procedure in addi.t ion to the <br />product. line been completed? N/A <br />NDF TECHNOLOGY) INC. PHOPR:Ir?'I'A11Y <br />WATT I r,C . :. I :s t I ,11 Itr1;1Vt �: I)R 1 �'t:, 11AKr,I�s1 iEl.r►, ('A 9:330H(�3t1�, I :3':.'2 9827 <br />
The URL can be used to link to this page
Your browser does not support the video tag.