Laserfiche WebLink
A KNOLOG <br />TECHNOLOGY FOR TANKS <br />AND THEIR ENVIRONMENT <br />Owner CHEVRON USA PRODUCTS CO. <br />Invoice Name/Address CHEVRON USA PRODUCTS CO. <br />Site Name/Address CHEVRON USA PRODUCTS CO. <br />VacuTectlrm TEST REPORT <br />S.O. # <br />Date <br />Site # 95775 <br />Phone <br />ACCOUNTS PAYABLE SECTION P.O. BOX 5004 SAN RAMON, CA 94583 <br />Attn: <br />301 W. KETTLEMAN LODI, CA 95240 <br />174708 <br />04/15/96 <br /><510> 842-9624 <br />MARGE FARRAR <br />TANKS <br />LINES <br />Leak Det <br />Ullage <br />TANKS and LINES Tested to CFR -40 Parts <br />See <br />Tank <br />Dipped <br />Dipped Probe Water Bubble Air <br />Line <br />Final <br />Exist <br />280-281 & NFPA 329 Specs. <br />Diag. <br />Dia. & <br />Water <br />Product Water Ingress Ingress Ingress TANK <br />Line <br />Delivery <br />LINE <br />LINE <br />Leak <br />LINE <br />LD(s) <br />NEW <br />For <br />Material <br />Level <br />Level Level Detected Detected Detected ■ <br />Material <br />Syst. Type <br />TEST <br />TEST <br />Rate <br />■ <br />Pass/ <br />LD(s) <br />t oc <br />ST/ <br />■ <br />■ ■ ■ ■ ■ Tight <br />■ <br />■ <br />■ <br />■ <br />■ <br />Tight <br />Fail/ <br />Tested <br />A <br />Tank <br />Tank <br />FRP/ <br />START <br />START START or <br />ST/ <br />START <br />END <br />or <br />or <br />& <br />Other: <br />Lined <br />END <br />END END Yes/No Yes/No Yes/No Fail <br />Line # <br />FRP <br />PS/SS/GS <br />TIME <br />TIME <br />GPH <br />Fail <br />NONE <br />PASS <br /># <br />Product <br />Capacity <br />1 <br />W S T <br />1000Diameter <br />1. 7 5 0 <br />015.5 0 00.0001 N N N rtT <br />1 <br />- <br />Exist LD SN/MDL/MFG <br />OIL <br />48D1 <br />New/2nd LD SN/MDL/MFG: <br />.750 <br />015. 50 00.0001 <br />LINE TEST PSI <br />Material <br />Percent of Fitl atump <br />Stan Time: 15: 3 5 Time of Test: 2 8 . 0 Mf .. <br />FRP <br />Dispenser Shear Valves <br />Operate es/no <br />an roe nc inometer <br />End Time: 17: T t P I: — Ent : Decrees: <br />2 <br />SUPR <br />Diameter <br />2A <br />FRP <br />S5 <br />L 8:24 <br />8:54 <br />0.000 <br />T <br />- <br />- <br />Exist LD SN/MDL/MFG: <br />U N L <br />FRP <br />SS21:09 <br />21 : 3 9 <br />0.000 <br />T <br />New/2nd LD SN/MDL/MFG: <br />2C <br />FRP <br />SS <br />22:55 <br />23:25 <br />0.000 <br />T <br />LINE TEST PSI 15.00 <br />_172B <br />aterla <br />Start Time: Time of Test: at Mfg.: <br />Dispenser Shear Valves <br />an roenc inometer <br />End Time: Test PSI: Entry: De rees: <br />Operate es/no <br />3 <br />PLUS <br />Diameter <br />3A <br />FRP <br />SS <br />L9:08 <br />19:38 <br />0.000 <br />T <br />— <br />Exist LD SN/MDL/MFG: <br />UNL <br />3B <br />FRP <br />SS <br />2 19 <br />22 : 49 <br />0. 000 <br />T <br />Naw/2nd LD SN/MDL/MFG: <br />LINE TEST PSI 15.00 <br />atenal <br />Pu <br />Start Time: Time me o0f 1 oI I at Test: Mf .. p <br />Dispenser Shear Valves <br />lanK Probe Inclinometer <br />End TinHI Test PSI: Entry: Decrees: <br />Operate es/no <br />4 <br />REG <br />Diameter <br />4A <br />FRP <br />SS <br />L 9: 47 <br />20 : 17 <br />0.000 <br />T <br />— <br />— <br />Exist LD SN/MDL/MFG <br />UNL4 <br />B <br />FRP <br />SS <br />0 25 <br />20 :55 <br />0.000 <br />T <br />New/2nd LD SN/MDL/MFG: <br />4C <br />FRP <br />SS <br />21: 45 <br />22 :15 <br />0 .000 <br />T <br />LINE TEST PSI 15.00 <br />aterla <br />Start Time: Time of Testill at Mfg P <br />Dispenser Shear Valves <br />Tank ro a Inclinometer <br />End Time: Test PSI: Entry- Dearees. <br />4n <br />FRP <br />R S <br />? _3 9 <br />23 :59 <br />0 .000 <br />T <br />I <br />Operate es/no <br />ameter <br />Exist LD SN/MDL/MFG: <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI: <br />materialroent <br />o I at ump <br />Start Time: Time of Test: Mfg.: <br />Dispenser Shear Valves <br />an Probe Inclinometer <br />End Time: Test PSI: Entr : Dear <br />Operate es/no <br />ameter <br />+_ <br />Exist LD SN/MDL/MFG: <br />I <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI <br />_175—terl—ar <br />Percent of Fillatump <br />Start Time: Time of Test: Mfg.: <br />Dispenser Shear Valves <br />an be Inclinometer <br />End Time: -Test PSI: Ent . D r <br />Operate es/no <br />TANKNOLOGY Region: WESTERN REGION Unit # 015 State Lic. # <br />NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. <br />TAK-01 <br />Tanknology Corporation International <br />State: CA 5225 Hollister St., Houston, TX 77040 <br />(800) 888-8563 • FAX (713) 690-2255 <br />