My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2300 - Underground Storage Tank Program
>
PR0231345
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:40:56 PM
Creation date
10/11/2018 2:50:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231345
PE
2381
FACILITY_ID
FA0003713
FACILITY_NAME
CHEVRON #95775 MCCOMBS* (INACT)
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VacuTectT"" TEST REPORT 1-3�� <br />TECHNOLOGY FOR TANKS S.O. yF <br />AND THEIR ENVIRONMENT J # <br />Owner <br />Invoice Name/Address T,U- UIUJZ DUO D -. 315 q3 <br />Site Name/Address 3 D l 7� . %�M %, . 4ca-� ( 95 <br />Site # 9,5-27-5- Dat 4/ <br />P one <br />Attn: /> c� <br />TANKNOLOGY Region: 9b, Unit # State Lic. # State: <br />NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. <br />TAK-02 <br />Tanknology Corporation International <br />5225 Hollister St., Houston, TX 77040 <br />(800) 888-8563 111, FAX (713) 690-2255 <br />TANKS <br />LINES <br />Leak Det <br />See <br />Deg <br />Tank <br />Dia. B <br />Dipped <br />Water <br />Dipped <br />Product <br />Probe <br />Water <br />Water <br />Ingress <br />Bubble <br />Ingress <br />Ullage <br />Air <br />Ingress <br />TANK <br />Line <br />Line <br />Delivery <br />LINE <br />LINE <br />Final <br />Leak <br />LINE <br />Exist <br />LD(s) <br />NEW <br />TANKS and LINES Tested to CFR -40 Parts <br />280-281 & NFPA 329 Specs. <br />Tank <br /># <br />Tank <br />Product <br />Tank <br />Capacity <br />Material <br />ST/ <br />FRP/ <br />Lined <br />Level <br />■ <br />START <br />END <br />Level <br />■ <br />START <br />END <br />Level <br />■ <br />START <br />END <br />Detected <br />■ <br />Yes/No <br />Detected <br />■ <br />Yes/No <br />Detected <br />■ <br />Yes/No <br />■ <br />Tight <br />or <br />Fail <br />Line # <br />Material <br />■ <br />ST/ <br />FRP <br />Syst Type <br />■ <br />PS/SS/GS <br />TEST <br />■ <br />START <br />TIME <br />TEST <br />■ <br />END <br />TIME <br />Rate <br />■ <br />GPH <br />■ <br />Tight <br />or <br />Fail <br />Pass/ <br />Fail/ <br />or <br />NONE <br />LD(s) <br />Tested <br />& <br />PASS <br />Other: <br />I , <br />Diameter <br />/ <br />' <br />h <br />E—I LD SN/MDLMFG <br />New LD SN/MDL/MFG <br />LINE TEST PSI A) j�} <br />1 <br />0,.,ale es/nor Valy <br />a <br />aterl8Percent <br />pan <br />o I at Pump <br />Start Time:&35 Time of Test:J. Mf W- <br />ro a nc inometer "1 <br />End Time: T PSI: G Entry. e r /l/ <br />•/Diameter <br />©VQ <br />V <br />9a <br />/ <br />1 <br />(J <br />, s' } <br />/✓ V <br />) <br />V <br />�'y <br />V <br />�e <br />T <br />5 -T <br />I <br />S <br />1� <br />J <br />O <br />O, O <br />I <br />, <br />Ezrst LD SN/MDL/MFG <br />New LD SN/MDL/MttFG <br />f <br />0, 00 �_ 1 s -T ss <br />L INE TEST PSI <br />Dispenser n. valves <br />O ,rate es/no <br />Material <br />s� y� <br />�,`/" <br />rcent O at � ump /i <br />Start Time: Time of Test: i Mf .. /Y GB <br />•� <br />q <br />End Time: 13. Tant PSI. "— �• Entry: i Dc Ireeseter <br />/(q' CD(A <br />Diameter <br />.S <br />,wvU <br />A <br />,4 <br />C/ <br />(� <br />1/7 <br />E-1 LD SN/MDL/MFG <br />NewLD SN/MDL/MFGC <br />LINE TEST PSI <br />Dispenser Shear Vaiv <br />oR/' <br />/�%a <br />erate es/no <br />15; 5/3 T � <br />Materialrcent <br />of Fillat d ,C, ump '2e S �- � � a /i{ v • v r <br />Stan Time: Time of Test: �V Mf .: J 7!f <br />Probe nC mOmeter <br />—(rn Time: OTestEntry: r S T /L© s ti <br />Diameter <br />'U v <br />�)O <br />�h' <br />,- ✓ <br />e A <br />/1 <br />ii <br />rT <br />/I <br />4�� <br />-// <br />�L,s� <br />Ili <br />�� <br />Exist LD SN/MDUMFG <br />New LD SN/MDL/MFG <br />erase es/no /✓ <br />LINE TEST PSItateria <br />`/ . �V <br />/ r y C ( <br />.J <br />` o13 -1s -A.4 <br />teria <br />rcent O I at umpSJ �T SS \ <br />me: 9 - Time of Test: , U Gr Mfg- I S 3y <br />an roe nc inometerDispenserShearValv,s v `KT P I: '-" /. n r r I �t;�0,s <br />Diameter <br />Exist LD SN/MDL/MFG <br />New LD SN/MDL/MFG <br />LINF TEST PSI <br />Dispenser Shear Valves <br />O eratel es/no <br />rcento at ump <br />me: Time of Tesl: Mt .:an <br />roe nc inometer <br />T PSI: Entryr <br />Diameter <br />Exist LD SN/MDL/MFG'. <br />New LD SN/MDL/MFG <br />LINE TEST PSP. <br />Dispenser Shear Valves <br />O ,rate es/not <br />Wa —te r -ia7 <br />Percento at Purn <br />Start Time: Time of Test: Mfg.: <br />an robe nC inometer <br />n Tim T P C n D r <br />TANKNOLOGY Region: 9b, Unit # State Lic. # State: <br />NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. <br />TAK-02 <br />Tanknology Corporation International <br />5225 Hollister St., Houston, TX 77040 <br />(800) 888-8563 111, FAX (713) 690-2255 <br />
The URL can be used to link to this page
Your browser does not support the video tag.