Laserfiche WebLink
VALLEY PACIFIC PETROLEUM SERIVICES, INC — STOCKTON FACILITY <br /> FORMAL EXTERNAL TANK INSPECTION <br /> TANK:AST-3 <br /> Inspection Date: February 15, 2017 <br /> Photo 9: Leaks from top mounted pump and connections evident from the northwest end of <br /> AST-3. <br /> Photo 10: Paint failure concentrated on top of the tank at the southeast end of AST-3. <br /> 4M <br /> W CONDOR <br />