Laserfiche WebLink
VALLEY PACIFIC PETROLEUM SERIVICES, INC - STOCKTON FACILITY <br /> FORMAL EXTERNAL TANK INSPECTION <br /> TANK:AST-1 <br /> Inspection Date: February 15, 2017 <br /> Photo 13: Southwest side of AST-1, leaking pipe connection and leaks from the mounted pump <br /> dripping onto tank shell. <br /> vx-o, <br /> do CONDOR <br />