Laserfiche WebLink
Cesar Ruvalcaba [EH] <br /> From: Ed Ward <ed.ward@vpps.net> <br /> Sent: Monday, November 12, 2018 3:10 PM <br /> To: Cesar Ruvalcaba [EH] <br /> Subject: FW:APSA/SPCC inspection report - 166 Frank West Circle -PR0515523 <br /> Attachments: 10-26-18 166 FWC APSA RTC Submission.pdf <br /> Cesar hope you are doing well... Following up with my RTC to make sure we can close the 166 APSA inspection as <br /> compliant? <br /> Could you please respond to this email to confirm you received <br /> Regards <br /> VALLEY PACIFIC Ed Ward <br /> Risk& Regulatory Manager I Valley Pacific Petroleum Services, Inc. <br /> A: 152 Frank West Cir., Suite 100 1 Stockton, CA 95206 <br /> P: 209.461.3626 c: 209.479.9697 <br /> www.vpps.net <br /> PERSONAL AND CONFIDENTIAL:This message and any file(s)or attachment(s)transmitted with it are confidential,intended only for the named <br /> recipient,and may contain information that is a trade secret,proprietary,or is otherwise protected against unauthorized use or disclosure.This <br /> message and any file(s)or attachment(s)transmitted with it are transmitted based on a reasonable expectation of privacy.Any disclosure, <br /> distribution,copying,or use of this information by anyone other than the intended recipient,regardless of address or routing,is strictly prohibited. <br /> If you receive this message in error,please advise the sender by immediate reply and delete the original message. Personal messages express only <br /> the view of the sender and are not attributable to Valley Pacific Petroleum Services, Inc. <br /> From: Ed Ward <br /> Sent: Friday, October 26, 2018 2:52 PM <br /> To: 'Cesar Ruvalcaba [EH]' <cruvaIca ba@sjcehd.com> <br /> Cc:Will Harp (will.harp@vpps.net) <will.harp@vpps.net>; Doug Tolleson (doug.tolleson@vpps.net) <br /> <doug.tolleson@vpps.net> <br /> Subject: RE:APSA/SPCC inspection report- 166 Frank West Circle-PR0515523 <br /> Importance: High <br /> Cesar to follow up... the leaking noted in the tank integrity testing has been visually inspected and has been repaired. <br /> The repair shop has had the tanks and barrels removed and will not require roll over berm for now, no large quantities <br /> of oil are being stored there. <br /> I have attached the RTC which should close our open items, it includes references and pictures <br /> The technical SPCC changes were submitted to Condor Earth. Regarding totes stored in corner lot and we received that <br /> document today... it is available if you want to see. <br /> The tank integrity testing was previously forwarded to you. <br /> Please respond to this email to confirm you received and were able to open the attachment. <br /> After your evaluation please let me know if this APSA inspection has returned to compliance and I can expect it to be <br /> closed. <br /> i <br />