My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARTHUR
>
23534
>
2800 - Aboveground Petroleum Storage Program
>
PR0524264
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 3:38:55 PM
Creation date
10/11/2018 4:24:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0524264
PE
2832
FACILITY_ID
FA0006141
FACILITY_NAME
A L POWELL TRUCKING
STREET_NUMBER
23534
Direction
E
STREET_NAME
ARTHUR
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
22903010
CURRENT_STATUS
01
SITE_LOCATION
23534 E ARTHUR RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.segov.org/ehd <br />ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br />Facility <br />Name: A L Powerand Trucking <br /># <br />Facility <br />Address: 23534 E Arthur Road, Escalon, CA <br />Inspection Oct 8, 2013 <br />Date: <br />Facility <br />Keith Powell <br />Code SeCtlOn <br />Title: <br />Ownery <br />Phone: <br />Contact <br />Inspection XRoutine Follow up <br />Type: <br />i Complaint - ID*. <br />-j Other. <br />(Authority HSC 25270.4) <br />Consent for. Xinspection XSampling XPhotos Granted by: <br />Keith Powell Owner <br />Title: <br />AST <br />104 HSC 25270.6(b) Failed to submit APSA fees <br />WJ <br />rl� <br />201 <br />CFR 112.3(d) <br />SPCC Plan certification by a Professional Engineer (PE) missing or incomplete <br />202 <br />Total Facility Shell <br />Content <br />li <br />Failed to retain a copy of the SPCC Plan on site <br />-- <br />---- <br />- --- <br />- <br />- - <br />--- <br />---- <br />----- <br />Capacity (gal): <br />(gal)- <br />SPCC Plan .year <br />Review Date: <br />-----n- <br />Shell <br />Caps <br />---- <br />I <br />---`-/-� <br />v <br />-j� <br />CFR 112.5(b) after scheduled 5 year Plan review <br />303 <br />SPCC Plan type: i APSA SPCC conditionally exempt (HSC 25270.4.5(b)) XFully or partially Professional Engineer certified Self -certified <br />VIOLATIONS <br /># <br />C1 <br />C2 <br />M <br />Code SeCtlOn <br />HSC = California Health and SafetyCode; CFR = Code of Federal R ulations <br />C1 = Class 1 violation; C2.= Class 2 violation; M = Minor violation <br />Aboveground Petroleum Storage Act <br />101 X HSC 25270.4.5(a) Failed to prepare a written SPCC Plan in accordance with CFR Part 112 <br />102 HSC 25270.4.5(a) Failed to conduct periodic inspections of the storage tank to assure compliance with CFR Part 112 <br />Failed to file business plan or annual tank facility statement if capacity >1 OK gallons and 25% <br />103 HSC 25270.6(a) petroleum <br />104 HSC 25270.6(b) Failed to submit APSA fees <br />105 HSC 25270.8 Failed to report spills or releases of 42 gallons or more <br />Requirement to Prepare and Implement a SPCC Plan <br />201 <br />CFR 112.3(d) <br />SPCC Plan certification by a Professional Engineer (PE) missing or incomplete <br />202 <br />CFR 112.3(e) <br />Failed to retain a copy of the SPCC Plan on site <br />Amendment of SPCC Plan by owners or operators <br />Failed to amend SPCC Plan within 6 months, or implement changes within 6 months of amendment <br />301 <br />CFR 112.5(a) when there is an applicable change to the facility <br />Failed to amend SPCC Plan within 6 months, or implement changes within 6 months of amendment <br />302 <br />CFR 112.5(b) after scheduled 5 year Plan review <br />303 <br />CFR 112.5(b) Failed to complete a review and evaluation of SPCC plan at least once every 5 years <br />304 <br />CFR 112.5(c) Failed to have a PE certify technical amendments within 6 months of change <br />Qualified Facilities Plan Requirements <br />Tier I qualified facility failed to self -certify (1) SPCC Plan; (2) technical amendment when there was an <br />401 <br />CFR 112.6(a) <br />applicable change to the SPCC Plan <br />402 <br />CFR 112.6(a)(3) <br />Tier I qualified facility SPCC Plan incomplete <br />Tier II qualified facility failed to self -certify (1) SPCC Plan; (2) technical amendment when there was an <br />403 <br />CFR 112.6(b) <br />applicable change to the SPCC Plan <br />Failed to provide written PE certification in a self -certified plan for alternate methods which provide <br />404 <br />CFR 112.6(b)(4) <br />environmental equivalence, or provisions in lieu of secondary containment due to impracticality <br />General Requirements for SPCC Plans <br />Failed to include a cross-referencing section for a Plan that does not follow the sequence specified in this <br />501 <br />CFR 112.7 <br />section <br />SPCC Plan lacks full approval of management at a level of authority to commit the necessary resource <br />502 <br />CFR 112.7 <br />to implement the Plan <br />Failed to provide equivalent environmental protection and/or state the reasons for nonconformance and <br />503 <br />CFR 112.7(a)(2) <br />describe the alternate methods and how they achieve equivalent environmental protection <br />No facility diagram or diagram failed to show location and contents of each container, transfer stations, <br />504 <br />CFR 112.7(a)(3) <br />and connecting pipes. <br />505 <br />CFR 112.7(a)(3)(i) <br />SPCC Plan failed to include description of product type and storage capacity for each container <br />SPCC Plan failed to include procedures for routine handling of products and discharge prevention <br />506 <br />CFR 112.7(a)(3)(ii) <br />measures <br />SPCC Plan failed to show discharge or drainage controls (secondary containment), equipment, and <br />507 <br />CFR 112.7(a)(3)(iii) <br />procedures for the control of a discharge <br />508 <br />CFR 112.7(a)(3)(iv) <br />SPCC Plan failed to show countermeasures for discovery, response and cleanup of discharges <br />Inspector Received By: Title: <br />9 1 C� 11 � <br />ADCA im zPrrTIr1N PFPr1PT <br />env co-vc r .v vve i of is <br />
The URL can be used to link to this page
Your browser does not support the video tag.