My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
641
>
2300 - Underground Storage Tank Program
>
PR0231836
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 3:12:00 PM
Creation date
10/12/2018 11:32:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231836
PE
2381
FACILITY_ID
FA0002405
FACILITY_NAME
QUICK N SAVE MARKET AND GAS*
STREET_NUMBER
641
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14734106
CURRENT_STATUS
02
SITE_LOCATION
641 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division.phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Reqak-ed by Sections 2632(d) and 2641(h) CCR- <br /> Facility <br /> CRFacility Name � 1J qq — A/ - VF �J� <br /> Facility Address4yf e-72k1 <br /> A. Describe the frequ,of performing a monitoring: <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring:_ <br /> Tank <br /> Piping <br /> C. Describe the locations) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and sle(s) of the people responsible for performing the monitoring <br /> and/or maintaining :he equipment: <br /> E. Reporting format fer monitoring: <br /> Tank <br /> Piping <br /> F. Describe the preve-.&e maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: t el m ( i ll F 2 D Illy i9i9r- <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the onitcrinv tquipment: zl� ;fU/^%NS <br /> Eeayt4i 1/117yiv <br />
The URL can be used to link to this page
Your browser does not support the video tag.