Laserfiche WebLink
Spill Prevention Compliance Corporation <br /> Periodic Integrity Test Certificate <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 969-0851 <br /> Email: spccorpna hotmail.com <br /> ------------------------------------------------------------------------------------------------------------------------------- <br /> Client: Stockton Steel Co. Contact : Ron Fleming, SECA, Inc. <br /> Address: 3003 E. Hammer Lane. Phone No.: (602) 619-5040 <br /> City/State/Zip;_ Stockton, CA 95212 Date of Test: 2-8-18 <br /> Product Stored: Diesel Fuel <br /> Tank Information(Brand/gallonage/Fuel Stored/UL or other serial#/miscellaneous) <br /> Unknown/10,000 gals/Diesel Fuel/UL142/UL#445419/Double Wall Steel/27 yrs old(1991 ) <br /> Description of Secondary Containment Integral Secondary Containment <br /> Date of Test 2-8-18 Test Supervisor(s) Todd McWhorter <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary XX Secondary XX <br /> 1. Steel Thickness Test(in accordance with API-653 and/or STI SP001 (5`h edition)-Readings Steel <br /> Thickness UL142 min. .240 in./Avg Steel thickness measured =.248 in <br /> 2. Inert Gas Blanket <br /> Gas Used: Nitrogen CO2: Other(specify) <br /> Air Pressure-Test Vacuum Test ; <br /> Initial Reading(document psi/WC readings) Time <br /> End Readings (document psi/WC readings) Time <br /> Duration of Test: %drop <br /> 3. Sonar-Test_YN (document db readings) Duration <br /> 4. Camera(visual) model Lorex MC81845/interstitial (Result: P/F) Pass <br /> 5. Hydro-Carbon Sensor(probe) model OMNTEC BOA- (Result: P/F) Pass <br /> 6. Hydrology (Water Column) ( inches of water column readings) <br /> Duration %Drop Results (P/F) <br /> 7. Other: Inspect PrimaryVessel & Secondary containment. AST clearance is 5 inches above floor. <br /> CRDM present, no evidence of leaking product from vessel, Pining& ancillary equipment inspected, <br /> found to be leak free,and operating within normal parameters, system was easily accessible for <br /> inspection: No evidence of leak or of any product/Tank is suitable for continued usage •PASS <br /> TEST RESULTS <br /> 0-Stage: <br /> Pass XX Fail_(quantify) SENSOR DETECTS NO PRODUCT , NOR LEAKS FROM PRIMARY <br /> TANK INTO SECONDARY CONTAINMENT <br /> 2"-Stage: <br /> Pass XX Fail_(quantify) NO VISUAL EVIDENCE OF LEAKED PRODUCT (NOR ANY <br /> LIQUID)IN THE SECONDARY- STEEL THICKNESS MEASURED TO BE IN EXCESS OF <br /> MINIMUM UNDER UL 142 STANDARD <br /> Comments section Tank is anchored to concrete pad with '/ in. anchors data on file <br /> Next Scheduled Periodic Integrity Test <br /> Date of Next Scheduled Test 2-8-23 <br /> SPC Corp Representative <br /> STI SPOOL Certified Inspector No.: AST 135013 <br />